spectra contract flooring california:加利福尼亚谱合同地板

上传人:tian****1990 文档编号:81517251 上传时间:2019-02-21 格式:DOC 页数:5 大小:46KB
返回 下载 相关 举报
spectra contract flooring  california:加利福尼亚谱合同地板_第1页
第1页 / 共5页
spectra contract flooring  california:加利福尼亚谱合同地板_第2页
第2页 / 共5页
spectra contract flooring  california:加利福尼亚谱合同地板_第3页
第3页 / 共5页
spectra contract flooring  california:加利福尼亚谱合同地板_第4页
第4页 / 共5页
spectra contract flooring  california:加利福尼亚谱合同地板_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

《spectra contract flooring california:加利福尼亚谱合同地板》由会员分享,可在线阅读,更多相关《spectra contract flooring california:加利福尼亚谱合同地板(5页珍藏版)》请在金锄头文库上搜索。

1、Platform Project Management,LLC INDEPENDENT INSTALLATION SUBCONTRACTOR AGREEMENTPlatform Project Management, LLC (hereinafter, Contractor) and _ (hereinafter, Independent Installation Subcontractor, or IIS) enter into the following agreement (“the Agreement”) whereby IIS agrees to provide floor cove

2、ring installation services on jobs designated by Contractors work orders, subject to these general terms and conditions:1. Terms. All work orders issued by Contractor shall be deemed to incorporate these general terms and conditions along with additional specific references to job requirements which

3、 together shall constitute a subcontract for each job or project. Further, IIS agrees that all terms and conditions of any contract between Contractor and any higher-tier contractor or owner shall be incorporated herein by this reference and made a part of this Agreement and IIS further agrees that

4、IIS has been offered the opportunity to review said terms and conditions. This Agreement and all of the agreements set forth in this Section l shall hereinafter be referred to as the “Contract Documents”.2. Subcontractor Status. IIS certifies that it is an independent contractor and, as an independe

5、nt employing unit, shall comply with all federal, state and local tax laws, Social Security acts, unemployment compensation acts, workmens compensation acts, old age retirement benefit, pensions and annuities, and accept full and exclusive liability therefore insofar as applicable to the performance

6、 of this Subcontract. IIS represents and warrants that it is fully and properly licensed by all applicable jurisdictions and will maintain all of said licenses at all times.3. Scope of Work. Contractor relies on the personal services of IIS in the performance and completion of floor covering install

7、ation work and no substitute independent installation subcontractor shall be permitted to perform and complete the work nor is this Agreement or any Subcontract assignable without Contractors prior written permission. Except for materials provided by Contractor, IIS agrees to provide all labor, mate

8、rial, equipment and services necessary to complete the work in a good and workmanlike manner and in strict conformance with all applicable plans, specifications, industry standards, manufacturers installation instructions and in full conformance with all applicable laws and regulations.4. Warranty.

9、Any and all deviations from the plans, specifications, industry standards, manufacturers installation instructions or other applicable laws or regulations are deemed to be defects in workmanship and shall be corrected by IIS at IISs sole expense. IIS warrants all work for a period of one (1) year fr

10、om completion of Contractors work. In the event that demand is made upon IIS to perform under this warranty, IIS at its sole cost and expense shall expeditiously repair or replace any defective work and repair or replace any damage to the work of others caused by such defective work. In the event II

11、S shall fail to perform under this warranty, Contractor shall have the right to hire other persons to correct the defective work and hold IIS liable for the costs thereof including costs, disbursements, reasonable overhead and reasonable attorneys fees incurred therein.5. Performance of Work. Prior

12、to the commencement of work, IIS shall inspect the job and the job site conditions and shall notify Contractor promptly in writing of any and all defects or deficiencies in the work performed by other trades, incompleteness of prior work, or other job site conditions that might prevent IIS from comp

13、leting the work in the time specified and in a good and workmanlike manner. Unless Contractor directs commencement of work following such written notice, commencement of work by IIS shall constitute IISs certification to Contractor that there are no adverse job conditions that would delay or impact

14、completion of the job in a good and workmanlike manner. Time is of the essence of this Agreement relating to the commencement, performance and completion of IISs Work. IIS shall commence its Work as Contractor may direct and shall thereafter continuously prosecute and timely achieve final and satisf

15、actory completion of the same. IIS agrees that no extension of time will be granted without the prior written approval of Contractor. If work shall be stopped by IIS for more than three days because of IISs failure or refusal to continue work for any reason, then the Contractor may, at Contractors s

16、ole discretion, terminate the contract, or hire other individuals or entities to complete the work and hold PPM liable for all costs associated with such completion of the work. 6. Insurance. The IIS for Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder