1、1,2,3,4,5,6,7,8,9,10,11,12,KINGKEY 100 SHENZHEN CHINA 2011 YUJI AOYAGI / PROJECT DIRECTOR,COMENCEMENT OF WORK : 2008 APRIL TOPPING OUT OF SUPERSTRUCTURE : 2011 MARCH COMPLETION OF PROJECT : 2011 DECEMBER,13,PROJECT RECORDS OF CONSTRUCTION FOR SKYSCRAPER BY YUJI AOYAGI TOTAL ACCUMULATING HEIGHT : 3,0

2、00 M,14,PROJECT MANAGEMENT POLICY,1. QUALITY ASSURANCE 2. PROGRESS ASSURANCE 3. SAFETY ASSURANCE 4. COST CONTROL ASSURANCE 5. COORDINATION BETWEEN RELEVANT PARTIES 6. SAVE ENEGY,15,FACT & WORK DESCRIPTION,EXCAVATION AND EARTH ANCHORING WORKS 22,000M2 / LAND AREA,16,SUPERPLASTICIZER CONCRETE FOR PUMP

3、ABLE OF TOWER & MATFOUNDATION,STRENGTH OF CONCRETE : C80 C60 C40,17,PILING WORKS FOR TOWER,6M DIA,18,CONCRETING OF MATFOUNDATION FOR TOWER,13,200 M3,19,CLIMBFORM SYSTEM FOR COREWALL,TO KEEP 5DAYS WORKING CYCLE FOR TOWER,20,ERECTION OF STEEL STRUCTURE,60,000 TON,21,FUBRICATION OF STEEL STRUCTURE,MAX.

4、 THICKNESS OF STEEL : 130mm,22,CURTAIN WALL WORKS,85,000 m2,23,HIGHSPEED LIFT & DOUBLE DECK LIFT,9 m/second speed,24,CONCLUSION,Shenzhen is one of the rapid speed development city in the world. However, we do not require of shenzhen construction speed. We assure the high quality of construction for

5、the building. When we have developed the Di Wang project in 1996,Construction speed was 3-days cycle per floor. This is record of construction speed in world and every architects, engineers were inspired and miracle. KK100 is too complicated structure as carved faade, set front to 1.5m at 50 floor,

6、set back to the top of building, all 3D dimensions, and 3 different structural systems for centre core system, centre void system and 50m high pipe truss column system. We have decided and guaranteed to complete the project with high quality and planed schedule for A-grade international standard off

7、ice and 5-star hotel facilities. Green for Building is that to keep energy, land, water, material and to economize the natural resources during construction and full period of building life. We have to provide high useful space with prevent of any pollution, good humans health and protect environment. YUJI AOYAGI,25,26,27,28,29,30,