1、装修合同装修合同, ,英文英文篇一:装修合同样本英文版(Contract No. ) Presentation This contract is based on the “Contract Law“ Construction of “construction management decoration“ ,combining Shenzhen Decoration Association has developed the XX edition of the contract and I Division actual operation of the development.(Contra

2、ct No. ) Decoration repair project turn-key contract Contract by: (hereinafter referred to as Party A) Name: xx Shenzhen branch office attached ID card or fill out a copy of identity card number Is home Address: Address:Identity card number : _ Phone :_ _888xxxxx_Contractor: Shenzhen Shuo Code Decor

3、ation Design Engineering Co., Ltd. (hereinafter referred to as Party B)In accordance with the “Contract Law of Peoples Republic of China“, “construction and installation works contract regulations“ and relevant laws, regulations, combined with the actual situation of the project, the two sides of eq

4、uality, voluntary, consensus based on the agreement reached as follows: A project overview Project title :site :Contractor : this contract annex “project budget“Contract means: The two sides agreed to adopt the following resolution means kinds of contract1 Before packet materials Part of the contrac

5、ting-included 3 Before not-includedPeriod:Start date: tentative on since _ years from the date (the actual calculation to B on the that the construction plan and budget for the book from start to the day after the period)Completion date :_The total duration for the day (as a result contract price (R

6、MB capital) : )¥(A project budget book) 2、 Working Party Party in the pre-_ days, Party B shall provide construction drawings have been identified sets of _ (_ copies of notes or practice), and B-site transfer. for the construction involved in a variety of applications, documents and other formaliti

7、es required for the construction of PartyB to provide water, electricity and coordinate with relevant departments to do a good job access, elevators, fire fighting equipment and protection.to remove the impact of the construction of the barrier, only(Contract No. )partially cleared of housing in the

8、 remaining furniture, furnishings and other protective measures. assigned to _ for the site on behalf of Party A, is responsible for project quality and progress of the supervision and inspection for acceptance, change, registration procedures and other matters.If they really need to remove the stru

9、ctural transformation of the original buildings or equipment pipelines, Party A is responsible to the appropriate departments for examination and approval procedures.is responsible for protecting the surrounding buildings and renovation, equipment, pipelines, and other green spaces are not damaged,

10、and bear the corresponding costs.Coordination of the relevant departments to do a good job defending the scene, fire, waste disposal, etc., and bear the corresponding costs.notify the neighborhood during the construction dust and noise generated by the possibility of living and working environment i

11、mpact to understand the coordination of relations and assume responsibility. GM gas, cable broadband networks to be working with the departments concerned with the construction of Party.3、B work By Party B is responsible for the design of the project, Party B provide the main part of the effect of p

12、lan design, floor plan, water and electricity reform plan, layout of smallpox, laying the ground work plans and other drawings. And organized practice that the construction drawings or site transfer. By the Party responsible for the design of the project, to participate in the construction of Party

13、organizations, or the practice of drawing the scene described the handover.assigned to _ for the B-site representatives, responsible for the fulfillment of the contract, as required, organize construction work, quality and quantity on schedule to complete the construction tasks, from Party B is resp

14、onsible for settlement of various matters.Party A direct contracting of other projects, Party B is obliged to work with other construction to ensure the quality of the project and the successful completion of the project.to comply with state or local governments and relevant departments of the const

15、ruction site management, and properly protect the construction site around the buildings, pipelines and other equipment from damage, the construction site to do a good job defending and rubbish removal, etc., deal with construction due to bring cause inconvenience to the people and with the surround

16、ing units (households) relationship.Construction of the relevant departments without the consent or approval of Party A are not free to Removal of the transformation the original building structure and pipeline equipment. Party without the consent of the original B Removal of the transformationunauthorized building structures or equipment pipeline, which took place caused by loss or incident (including fines), b