standard2

上传人:小** 文档编号:46747901 上传时间:2018-06-27 格式:DOC 页数:15 大小:255KB
返回 下载 相关 举报
standard2_第1页
第1页 / 共15页
standard2_第2页
第2页 / 共15页
standard2_第3页
第3页 / 共15页
standard2_第4页
第4页 / 共15页
standard2_第5页
第5页 / 共15页
点击查看更多>>
资源描述

《standard2》由会员分享,可在线阅读,更多相关《standard2(15页珍藏版)》请在金锄头文库上搜索。

1、2008 Water Conservation Plan for Public Water SuppliersPage 1 of 14THE COMMONWEALTH OF MASSACHUSETTSWATER RESOURCES COMMISSIONWater Conservation Questionnaire for Public Water Suppliers Effective date: July 13, 2000 Revised: March 12, 2008This questionnaire is based on the Water Conservation Standar

2、ds for the Commonwealth of Massachusetts, which were approved by the Water Resources Commission (July 2006, or latest version; see Reference No. 10). The water conservation standards outline key components of a successful water conservation and demand management program, and are intended to assist c

3、ommunities and public water suppliers in protecting and maintaining their water supplies. Each section of this form corresponds to one of the standards, and begins with a statement of the standard, followed by a series of questions. As part of the water needs forecasting and Water Management Act per

4、mitting processes, technical staff in the Office of Water Resources (Department of Conservation and Recreation) and the Department of Environmental Protection will review this questionnaire to assess success in meeting the Water Conservation Standards and opportunities for improving water system eff

5、iciencies.Who should complete this questionnaire? Public Water Suppliers applying for a Water Management Act permit, permit amendment or permit transfer from the Department of Environmental Protection Permittees undergoing a five-year review of their existing Water Management Act permit by the Depar

6、tment of Environmental Protection Public Water Suppliers requesting new or updated water needs forecasts from the Department of Conservation and Recreation, Office of Water Resources1 Entities applying for Interbasin Transfer Approval with the Massachusetts Water Resources Commission Water suppliers

7、 interested in planning for demand management Water suppliers planning a new water source When completing this form please note: See list of references at the end of this document. For specific information and background on the water conservation standards, see the latest version at http:/www.mass.g

8、ov/envir/mwrc/pdf/Conservation_Standards.pdf (Reference No. 10). If necessary, expand responses beyond the space provided and/or reference or attach appropriate plans or responses. Projects requiring an Interbasin Transfer (IBT) approval are subject to specific water conservation performance standar

9、ds that must be met prior to approval. IBT performance standards are available at http:/www.mass.gov/dcr/waterSupply/intbasin/download.htm (Reference No. 13).Questions? Contact: Anne Monnelly, Acting DirectorDuane LeVangie, Director Office of Water ResourcesWater Management Program Department of Con

10、servation and RecreationDepartment of Environmental Protection 251 Causeway Street, Suite 6001 Winter Street Boston, MA 02114Boston MA 02108 Anne.Monnellystate.ma.us Duane.Levangiestate.ma.us (617) 626-1395(617) 292-57061 See Policy for Developing Water Needs Forecasts for Public Water Suppliers and

11、 Communities and Methodology for Implementation, December 13, 2007, at http:/www.mass.gov/envir/mwrc/pdf/121307_waterneedsforcast.pdf THE COMMONWEALTH OF MASSACHUSETTS WATER RESOURCES COMMISSION2008 Water Conservation Plan for Public Water SuppliersPage 2 of 14WATER CONSERVATION QUESTIONNAIREGENERAL

12、 INFORMATION ON THE PUBLIC WATER SUPPLY SYSTEMWater Supplier: PWS ID#: Street Address: City/Town: Zip Code: Contact Person: Title: Tel.: E-mail: 1.Total volume of DEP Water Management-authorized water withdrawals (mgd):(a) Registered volume: mgd(b) Permitted volume during each 5-year permit period:

13、Volume _mgdFrom: To: Volume _mgdFrom: To: Volume _mgdFrom: To: Volume _mgdFrom: To: Total authorized withdrawal volume (a + b) for the current year: Permit expiration date (if applicable): 2.If not registered or permitted, state total volume of water withdrawals (mgd) from the most recent Annual Sta

14、tistical Report: 3.Is your Residential Gallons per Capita Day below 65?Yes NoRGPCD reported on the most recent ASR (date: 20 ) is gallons per capita day.4.Is your Unaccounted-for-Water below 10%?Yes NoUAW reported on the most recent ASR (date: 20 ) is %.5.Please attach a map of the municipalities se

15、rved by your water supply system and outline the area served by your system.THE COMMONWEALTH OF MASSACHUSETTS WATER RESOURCES COMMISSION2008 Water Conservation Plan for Public Water SuppliersPage 3 of 14Note: Citations and links can be found in the list of references at the end of this document.STANDARD 1.0: COMPREHENSIVE PLANNINGDevelop a written drought management plan that follows American Water Works Association drought management planning guidance (AWWA 2002 or latest version; Reference No. 2). Develop strategies appropriate to the system to reduce daily and seasona

展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 商业/管理/HR > 宣传企划

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号