1、程程 序序 文文 件件 Procedure Document重重庆庆英特空英特空调调有限公司有限公司Air International Chongqing Co., Ltd.文件名称(Doc Name):顾客特殊要求控制程序顾客特殊要求控制程序 Customer Special Requirements Control Procedure版次Ver页次Page发行日期Release Date 文件编号(Doc No): AICQ/QP-2101B/01 - 32003-01-101 目的目的 Objective识别、明确和满足顾客的特殊要求,以确保产品和过程全面满足顾客规定要求。The obj

2、ective of this procedure is to identify, define and meet the customer special requirements and to ensure that the products and processes can fully meet the customer requirements.2 适用范围适用范围 Applicable Scope适用于本公司所有顾客的特殊要求的控制。This is applicable to the control of the special requirements of all AICQ cu

3、stomers. 3 职责职责 Responsibility 3.1 项目开发初期横向协调项目组指定联系人负责及时与顾客沟通联络,识别和明确顾客特殊要求,批量生产后,由归口部门负责与顾客联系沟通。It is required to co-operate the contract person designated by project team in the previous development process, and communicate with customers to identify and define the special requirement from custom

4、ers. After mass production, the responsible department is responsible for communicating with customers.3.2 各职能部门及有关单位负责制订相应的计划和采取措施满足顾客的特殊要求。The functional departments and other associated departments are responsible to establish corresponding plans and actions to meet the customer special requireme

5、nts.3.3 技术工程部负责审核,验证顾客特殊要求,由技术工程部主管保存顾客特殊要求一览表 。The Engineering Department is responsible to review and verify the customer special requirements The Engineering Manager is to maintain the List of Customer Special Requirements.4 工作程序工作程序 Work Procedures4.1 顾客特殊要求的识别顾客特殊要求的识别 Identification of Custome

6、r Special Requirements 4.1.1 当有新客户、新产品、产品改型或生产条件改变的情况下,需要进行产品质量先期策划和制程程 序序 文文 件件 Procedure Document重重庆庆英特空英特空调调有限公司有限公司Air International Chongqing Co., Ltd.文件名称(Doc Name):顾客特殊要求控制程序顾客特殊要求控制程序 Customer Special Requirements Control Procedure版次Ver页次Page发行日期Release Date 文件编号(Doc No): AICQ/QP-2101B/02 -

7、32003-01-10订控制计划时,本公司横向协调项目组有关人员或归口部门指定联系人必须及时与顾客沟通、联络,识别和明确顾客的特殊要求,并由横向协调项目经理登记在顾客特殊要求一览表上。When it is required to conduct advanced product quality planning and establish control plans under the occasions of new customers, new products, product modification or production condition change, AICQ relat

8、ive persons of project team or functional departments shall appoint a liaison person to maintain timely communication with the customers, identify and define the customer special requirements, which must be recorded in the List of Customer Special Requirements by the project manager. 4.1.2 技术工程部负责审核

9、顾客特殊要求一览表 。The Engineering Department is responsible to review the List of Customer Special Requirements.4.1.3 横向协调项目组有关人员及其他有关人员针对顾客的特殊要求而制订相应的控制计划及所需的各种作业指导书。The relative persons of project team or other relative persons shall establish control plans and necessary work instructions in accordance w

10、ith the customer special requirements.4.2 顾客特殊要求的执行和满足顾客特殊要求的执行和满足 Implementing and Meeting Customer Special Requirements4.2.1 职能部门及有关单位负责按照控制计划及作业指导书执行工作并满足顾客的特殊要求。The functional departments and other relevant departments must perform their responsibilities and meet the customer special requirement

11、s in accordance with the control plans and work instruction. 4.2.2 横向协调项目组经理负责验证顾客特殊要求,并将有关结果记录于顾客特殊要求一览表中。Project manager is responsible to verify the customer special requirements and record the results in the List of Customer Special Requirements.程程 序序 文文 件件 Procedure Document重重庆庆英特空英特空调调有限公司有限公司

12、Air International Chongqing Co., Ltd.文件名称(Doc Name):顾客特殊要求控制程序顾客特殊要求控制程序 Customer Special Requirements Control Procedure版次Ver页次Page发行日期Release Date 文件编号(Doc No): AICQ/QP-2101B/03 - 32003-01-104.3 管理说明管理说明 Notes to Management4.3.1 在顾客的所有特殊要求没有明确和满足以前,不可生产和交付产品。The products cannot be manufactured or d

13、elivered before the customer special requirements are identified and met. 4.3.2 应识别、明确和满足所有不同顾客的特殊要求。It is required to identify, define and meet the special requirements of different customers. 4.3.3 顾客特殊要求一览表由工程技术部主管负责及时更新和长期保存。The Engineering Manager is responsible to update the List of Customer Special Requirements in a timely manner and maintain it for a long run. 5 质量记录质量记录 Quality Records 5.1 AICQ/QR-2101-01A 顾客特殊要求一览表AICQ/QR-2101-01A List of Customer Special Requirements