4.5m板模板工程施工计算书

上传人:aa****6 文档编号:37148312 上传时间:2018-04-07 格式:DOC 页数:11 大小:145KB
返回 下载 相关 举报
4.5m板模板工程施工计算书_第1页
第1页 / 共11页
4.5m板模板工程施工计算书_第2页
第2页 / 共11页
4.5m板模板工程施工计算书_第3页
第3页 / 共11页
4.5m板模板工程施工计算书_第4页
第4页 / 共11页
4.5m板模板工程施工计算书_第5页
第5页 / 共11页
点击查看更多>>
资源描述

《4.5m板模板工程施工计算书》由会员分享,可在线阅读,更多相关《4.5m板模板工程施工计算书(11页珍藏版)》请在金锄头文库上搜索。

1、synchronous backup software does not respond to the rest of the data to be modified. In order to ensure maximum server exception, saving some data, synchronization of real-time backup software should have high, that delay does not exceed 1 minute. Offsite backups that must be supported across networ

2、k segments. In accordance with the above requirements for development our dedicated backup software. After development, wing that opened in salt on high speed test results meet the design requirementsWith the passing of time, it is preparing source Huan of Hubei industrial investment company limited

3、 factory close to the planning of the day looks like, planning human ideals gradually into an entity, spread out before us. Security plan enters the deployed State. After listening to your business objective for the leaders of security, I quickly people with loyalty to the cause of security, as well

4、 as previous security experience, combined with peer pioneers of success stories or experiences. Border security on your business ideas and suggestions to make as follows: 1.1 after careful analysis of a blueprint of the enterprise, taking into account your enterprise factory boundary: 540.65M x 234

5、.24M rectangular site. 1.2 scope for such dachangqu, I recommend the solid border security deployment, for a range of reasons, whether we use infrared radiation, electronic fences, alarm had done there, where the response. Because the factory could not spend a great deal of manpower cost to post thr

6、ee steps, five steps and a whistle. As we all know, under the current form of human resources costs much higher than the cost of all scientific and technological input. In order to better achieve the goal of planners, as well as for Active solid border defense work. We recommend that you use infrare

7、d radiation or linkage of electronic fences with video security deployment to achieve security goals. 1.3 in accordance with the device on the wall of the compound properties and parameters to a reasonable plan to install the infrared radiation equipment or fences and electronic equipment as well as

8、 video surveillance equipment, the specific needs of the equipment and materials quantities we will detail later. 1.4 the programme according to your companys site to see and listen to the leadership proposal, and in accordance with the actual needs of the project, with reference to the relevant int

9、ernational standards and national standards, combined with the experience accumulated by the company engaged in multiple projects, prepare the technology package. If the contents or any other aspect of the programme has not detailed where we welcome your valuable comments. Second, the design princip

10、les of the project design follows technology advanced, functional, stable and cost-saving principles. And considering construction, maintenance and operation, and for future development, expansion, reconstruction and other factors leave room for expansion. Design elements of the system is the system

11、atic, integrated and comprehensive; design has the scientificity, reasonability and operability. Its has following principles: 2.1, and advanced and applicability used currently most advanced of soft, and hardware and the network technology, errors rate low, compatible sex strong, upgrade easy, used

12、 module type structure, expansion convenient, no repeat construction investment, system of technology performance and quality index should reached international leading level; while, system of installation debugging, and software programming and operation using and should simple, easy master, for Ch

13、ina conditions and this project of features. Set the number of advanced technology in a the systems, reflects the current level of the latest development of computer and network technology, adapted to the requirements of the times. While the system is the system used for various management levels, i

14、ts functions are configured to provide the user with comfortable, safe, fast and convenient to3.1, the intelligent building design standards (GB/t 50314-2000) 3.2, the design standard for intelligent building systems engineering (DB32/191-1998) 3.3, the codefor engineering design of generic cabling

15、system for city residential buildings (CECS/119-2000) 3.4, code for design of buildings and campus cable systems engineering (GB/T50311-2000) 3.5, the code for electrical design of civil buildings (JGJ/ T16-92) 3.6, the code for civil closed circuit monitoring TV system engineering technology (GB/50

16、198-94) 3.7, the types of system earthing and safety technical requirements (GB14050-93) 3.8, of the security engineering procedures and requirements (GA/T75-94) 3.9, the rules of security engineering acceptance (GA/T308-2001) 3.10, the industrial design of TV system code (GBJ 115) 3.11, the Security checks prevention system pass for graphics symbol (GA/74-94) 3.12, and fire linkage control equipment General technology conditions (GB 16806-1997) four, and system function and featur

展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 学术论文 > 毕业论文

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号