翻译好----p-e07 升压站及厂用电受电(移动变-升压站-启备变-6kv)

上传人:wt****50 文档编号:34698204 上传时间:2018-02-27 格式:DOC 页数:18 大小:525KB
返回 下载 相关 举报
翻译好----p-e07 升压站及厂用电受电(移动变-升压站-启备变-6kv)_第1页
第1页 / 共18页
翻译好----p-e07 升压站及厂用电受电(移动变-升压站-启备变-6kv)_第2页
第2页 / 共18页
翻译好----p-e07 升压站及厂用电受电(移动变-升压站-启备变-6kv)_第3页
第3页 / 共18页
翻译好----p-e07 升压站及厂用电受电(移动变-升压站-启备变-6kv)_第4页
第4页 / 共18页
翻译好----p-e07 升压站及厂用电受电(移动变-升压站-启备变-6kv)_第5页
第5页 / 共18页
点击查看更多>>
资源描述

《翻译好----p-e07 升压站及厂用电受电(移动变-升压站-启备变-6kv)》由会员分享,可在线阅读,更多相关《翻译好----p-e07 升压站及厂用电受电(移动变-升压站-启备变-6kv)(18页珍藏版)》请在金锄头文库上搜索。

1、Indonesia T.J.AWAR AWAR 2350MW Power Plant ProjectCommissioning Procedure of150kV Switchyard and Auxiliary Power Section Energizing150KV 升压站及厂用电部分送电调试程序No.: P-E07CUSTOMERPT.PLN (PERSERO) PT.PLN JASA SERTIFIKASIEPC CONTRACTOR SCP JO Northeast Electric Power Research Institute Co., Ltd(Liaoning Dongke

2、 Electric power Co., Ltd)Rev. Description Prepared Checked Approved Date12345NEPRIIndonesia T.J. AWAR AWAR 2350MW Power Plant Project Electrical Commissioning ProcedureICompilation Basis of the Guidance1. Indonesia T.J. AWAR AWAR 2350MW power plant project commission contract2. Design diagrams of Ch

3、ina United Engineering Corporation 3. The design specifications, operation and maintenance instruction, assemble manual and correlation diagram paper material of relevant manufactories4. Contract given by proprietor and minute of relevant meeting编制依据1. 印尼 Tanjung AWAR 发电站 2350MW 机组工程调试合同2. 中国联合工程公司设

4、计图纸3. 各设备厂家的设计说明、运行维护手册、装配手册以及相厂家的关图纸文件资料。4. 业主提供的合同及相关会议纪要Indonesia T.J. AWAR AWAR 2350MW Power Plant Project Electrical Commissioning ProcedureIICatalogueNEPRI.11. GENERAL .12. OBJECTIVE .23. ENERGIZING RANGE .24. PRECONDITION .35. ENERGIZING OF MOBILE TRANSFORMER .56. ENERGIZING OF 150KV SWITCHYA

5、RD .57. ENERGIZING OF SST .58. ENERGIZING OF 6KV COMMON SECTION .69. ENERGIZING OF 6KV WORKING SECTION .610. SAFETY MEASURE .711. SYSTEM DIAGRAM .13Indonesia T.J. AWAR AWAR 2350MW Power Plant Project Electrical Commissioning ProcedurePage 1 of 91. General 2350MW coal-fired generating units shall be

6、installed in T.J.AWAR AWAR power plant, which is provided with 150kV distribution equipment. Four circuits are led out from such equipment and then connected with the Indonesia 150kV system. A 3/2 CB wiring mode is used for 150kV distribution equipment. Two generating units are stepped up via a main

7、 transformer and then switched in 150kV busbar. The entire power plant is provided with one startup/backup transformer as the startup and backup power supply for the units of the power plant, which is connected via the busbar of 150kV distribution equipment. 150kV distribution equipment is arranged

8、outdoors in a middle-sized form, while CBs are dually arrayed. Each string of incoming and outgoing line circuit occupies 2 intervals. The main transformer and the outgoing line set in Circuit 1 form one complete string, and then the string is arranged in two intervals; the incoming line of the star

9、tup/standby transformer and the outgoing line set in Circuit 1 form one complete string, and then the string is arranged in two intervals; the main transformer in Circuit 1 and the urban supply transformer outgoing line as well as transformers are arranged in the interval of a complete string and oc

10、cupies two intervals. Both ends of the busbar are provided with a busbar earthing switch. Two 350MW turbo generator units are switched in 150kV distribution equipment in a connection unit form of generator-transformer bank. The outgoing end of the generator and the outgoing bushing at the end of a n

11、eutral point are equipped with four groups of current transformers; the outgoing end of the generator is equipped with three groups of potential transformers and one group of surge arresters; the neutral point of the generator is earthed via the secondary resistance of a single phase earthing transf

12、ormer. The generator and the main transformer are connected by using continuous enclosure-type isolated phase busbar. A high voltage station transformer and an excitation transformer are connected from between the generator and the low voltage side of the main transformer. A static self-shunt system

13、 is used for the excitation of the generator. Two voltage levels of 6.3kV and 400/230V are used in the station-service power system. The rated voltage of a medium voltage electric motor is 6kV, and the rated voltage of a low voltage electric motor is 380V/220. 2350MW coal-fired generating units are

14、installed in T.J.AWAR AWAR power plant. According to the load statistics of electrical equipment in all process systems of the power plant, each generating unit is provided with one high voltage station transformer, which is used to supply power for electrical equipment for the unit plant. The power supply at the high voltage side of the high voltage station transformer Indonesia T.J. AWAR AWAR 2350MW Power Plant Project Electrical Commissioning ProcedurePage 2 of 9are connected through a branch from an enclosed busbar between the ge