water information(超声波水表说明书)

上传人:第*** 文档编号:32819307 上传时间:2018-02-12 格式:DOC 页数:7 大小:437.83KB
返回 下载 相关 举报
water information(超声波水表说明书)_第1页
第1页 / 共7页
water information(超声波水表说明书)_第2页
第2页 / 共7页
water information(超声波水表说明书)_第3页
第3页 / 共7页
water information(超声波水表说明书)_第4页
第4页 / 共7页
water information(超声波水表说明书)_第5页
第5页 / 共7页
点击查看更多>>
资源描述

《water information(超声波水表说明书)》由会员分享,可在线阅读,更多相关《water information(超声波水表说明书)(7页珍藏版)》请在金锄头文库上搜索。

1、Add: Wujin District,Changzhou City,Jiangsu Province,Mao industry suppliers cubic; Http:- 1 / 8CUTE-LV SERIES ULTRASONIC WATER METERAdd: Wujin District,Changzhou City,Jiangsu Province,Mao industry suppliers cubic; Http:- 2 / 8PRODUCT INTRODUCTIONCHANGZHOU CUTE INTELLIGENT CO.,LTDAdd: Wujin District,C

2、hangzhou City,Jiangsu Province,Mao industry suppliers cubic; Http:- 3 / 81、Overview CUTE serial ultrasonic water meter module is the core part to work with the base meter to measure and display the water flow. CUTE serires ultrasonic water meter with the M-BUS interface, The staff can read the meter

3、 data at any time by the remote reading management system with the M-BUS interface and other device. 2、Function and Characteristic2.1 Under voltage warning;2.2 Automatic error correction tech;2.3 Temperature sensor cut and short circuit warning;2.4 Flow sensor failure warning;2.5 High definition and

4、 wide temperature LCD;2.6 Wide range ratio;2.7 Lithium battery life is more than 6+1;Add: Wujin District,Changzhou City,Jiangsu Province,Mao industry suppliers cubic; Http:- 4 / 82.8 Can read the meter data by infrared tool at the spot;2.9 With the M-BUS interface;3、Usage instruction1.The water mete

5、r operated by the menu, can change the work condition and display contents by the button on panel; There are 4 menu, the default is main menu, the change flow is as below:Means the long press time 2s;1) Main menu: normal condition;2) Error menu【E】3) Information menu【I】4) Verification program【F】Main

6、menu xxxxx.xxx m3 【E】【I】【F】Add: Wujin District,Changzhou City,Jiangsu Province,Mao industry suppliers cubic; Http:- 5 / 8The screen is off when stand by, press the button to awake the meter and enter the main menu, which show the accumulated flow(above figure), long press to change menu and read the

7、 data you need, the screen will be off after 3 minutes without any operation except the verification program【F】.Main MenuXXXXX.XXX m3XX.XXX m3/hAccumulation XXXXXXXX hDN20X.X.X.X.X.XXXInstant flowWork timeTypeFull screenAdd: Wujin District,Changzhou City,Jiangsu Province,Mao industry suppliers cubic

8、; Http:- 6 / 8Add: Wujin District,Changzhou City,Jiangsu Province,Mao industry suppliers cubic; Http:- 7 / 8Error menu operation【E】Press2sVacant pipe error (date)【E】1 XX.XX.XXS 2 XX.XX.XXSBattery fault (date)3 XX.XX.XXSReflux error (date)4 XX.XX.XXSSurpass the range ratio (date)Water temperature err

9、or (date)1 XXXXXXX hAccumulated time2 XXXXXXX hAccumulated time program【F】3 XXXXXXX hAccumulated time program【F】4 XXXXXXX hAccumulated time program【F】5 XXXXXXX hEE fault (date)6 XXXXXXX hAdd: Wujin District,Changzhou City,Jiangsu Province,Mao industry suppliers cubic; Http:- 8 / 85 XX.XX.XXS6 XX.XX.

10、XXS7 XX.XX.XXSTranducer fault flow in (date)Tranducer fault flow out (date)换能器故障 出水端 发生日期(年月日)7 XXXXXXX hAdd: Wujin District,Changzhou City,Jiangsu Province,Mao industry suppliers cubic; Http:- 9 / 8Information Menu【I】Verifivcation Menu【F】Press2s【F】XXX.XXXXX m3FXX.XXXXF XX.XXXFXX.XXXFXXX.XXXXX m3/hF

11、XX.XXFXX.XXXXFDirect flow usTime difference nsReflus time usZero clearSignal indicationWater temperature瞬流 Instant flowAccumulated flow8 XX.XX.XXS8 XXXXXXX hPress2.r-xx.xx.xxY M DXXXXXXXXXXXXXXXXr XXd-xx.xx.xxY M Dxx.xx.xxH M S【I】Main addSecond addEditionPresent datePresnet timeLast month Reading ti

12、me r-xx.xx.xxY M Dr-xx.xx.xxY M DXXXX.XXX m3XXXX.XXX m3Last 2 months ReadingLast 24 months Reading.Last 3 months Readingr-xx.xx.xxY M DXXXX.XXX m3XXXX.XXX m3Add: Wujin District,Changzhou City,Jiangsu Province,Mao industry suppliers cubic; Http:- 10 / 8Press2s按大于 2 秒Remark: Under the verification men

13、u, the accumulated flow and heat can be zero clear automatically, when the flow rate is 0,, if detect the flow rate in pipe is higher than the set point, zero clear the present accumulated data; When cant make zero clear under some extrem conditio, which can be done by manual;Exit the verification menu without any operation in 2 hours;Add: Wujin District,Changzhou City,Jiangsu Province,Mao industry suppliers cubic; Http:-

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 建筑/环境 > 工程造价

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号