1、 VISHAY GENERAL SEMICONDUCTOR(TIANJIN) CO.,LTD SPECIFICATION page:1 of 7 Document Title: The Emergency Response Plan Document No: CGS#047Originator: FE/EHS Dept. Rev.No./Date: 8/ 7/8/03Title: The Emergency Response Plan1. Purpose:To response for emergency incident/accident identified in the SCOPE, a

2、nd provide a procedure for fire fighting. Meanwhile, under the earthquake/explosion, the evacuation will be started as same as the fire disaster. 2. Scope:This procedure is apply for the following situation:Item Emergency Case1 Fire2 Explosion3 Earthquake3. Refence:N/A4. Procedure:This plan will be

3、implemented when our company threatened by conflagration or explosion / earthquake. All actions taken will be started in the plan and under the direction of the on-duty supervisor/loss prevention engineer.4.1 Program of ERT set up:4.1.1 The ERTs organization: The ERT constitute one coordinator as th

4、e director of EHS Dept. The ERT also constitute four group leaders, who come from MFG Dept. The ERT members mainly come from MFG Dept, HR Dept and FE/EHS Dept. Their names and telephone numbers are list in the attachments of this plan. The ERT is divided into 4 groups according to 4 shift (A, B, C,

5、D)4.1.2 The ERT training includes orientation training when employee was first time assigned to be the ERT member and annual refresh training. If someone cant attend the annually refresh training for some special job reasons as approved by the coordinator he/she must attend at least one training per

6、 year for familiarization. For example, FE and security guard may not attend the training due to special job reasons, but he must get approval from coordinator in advance. However, he should strict to the regulation that one refreshing training shall be received in a year.4.1.3 The ERTs responsible

7、for attack the incipient fire and assist the first aid group.4.2 Emergency Response Procedure VISHAY GENERAL SEMICONDUCTOR(TIANJIN) CO.,LTD SPECIFICATION page:2 of 7 Document Title: The Emergency Response Plan Document No: CGS#047Originator: FE/EHS Dept. Rev.No./Date: 8/ 7/8/03The Emergence Response

8、 will be started by two ways: The fire discoverer gives an alarm by pushing manual alarm. The fire discoverer gives an alarm by calling fire line 6333.4.2.1 By fire line 63334.2.1.1 When anyone notice a fire happening, he/she must inform fire control center immediately at extend number: 6333, and al

9、so any management at the scene.4.2.1.2 The on-duty supervisor/loss prevention engineer who receives the information should: Evaluate the situation. Inform ERT coordinator and Group leader promptly by telephone or pager. Inform the security officer using the PA system to repeat following call list at

10、 twice:“Attention please, there is a fire in (location of fire/Emergency), please stop your work and stand by to evacuation.” Stay in fire control center for deal with the telephone call and acknowledge the fire alarm.4.2.1.3 The coordinator of ERT should: Arrive the scene and direct the action of E

11、RT members to attack the fire by extinguisher. will evaluate the emergency situation and coordinate the activities of the various support groups. is responsible for determining if and when a partial or complete evacuation of the plant is necessary. When the fire situation has been kept under control

12、, the coordinator of ERT will give the order to security officer using PA system to repeat following instruction twice:“Attention please, the fire has been kept under control, please continue with your duties.” In the event the situation becomes uncontrollable, the coordinator must inform the local

13、Fire Brigade by himself or appoint loss prevention engineer to call the public fire line 119 and ensure the Fire Brigade has been informed and known the location of our company. After determined the completed evacuation, the coordinator will command the security officer using the PA system to repeat following call list twice:“ Attention please, this is emergency evacuation, please stop your work and leave your work area immediately.” VISHAY GENERAL SEMICONDUCTOR(TIANJIN) CO.,LTD SPECIFICATION page:3 of 7 Document Title: The Emergency