Construction workers internship report(建筑工人实习报告)

上传人:豆浆 文档编号:19103268 上传时间:2017-11-18 格式:DOC 页数:5 大小:27.50KB
返回 下载 相关 举报
Construction workers internship report(建筑工人实习报告)_第1页
第1页 / 共5页
Construction workers internship report(建筑工人实习报告)_第2页
第2页 / 共5页
Construction workers internship report(建筑工人实习报告)_第3页
第3页 / 共5页
Construction workers internship report(建筑工人实习报告)_第4页
第4页 / 共5页
Construction workers internship report(建筑工人实习报告)_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

《Construction workers internship report(建筑工人实习报告)》由会员分享,可在线阅读,更多相关《Construction workers internship report(建筑工人实习报告)(5页珍藏版)》请在金锄头文库上搜索。

1、1Construction workers internship reportConstruction workers internship report To participate in internships for XXX years XX January to December 30 XX years, Guangzhou mechanical construction Co., Ltd. reported that arrangements in Nansha, Guangzhou Canton the Longan home district (a bid of practice

2、, mainly with the construction workers to the site to participate in the construction practice . The site construction area of 68685.1 m2 site is located in the Pearl River estuary geology is silt, silt, silty soil, the low carrying capacity of the foundation piling basic framework structure, the us

3、e of shear walls load-bearing structure, the building in the district where the e1-4 malls kindergarten and life of the building, where d1-d2-d3, living quarters for the 11-storey building, the rest of the b1-1 4, b2-1 4, c1-1 4, c2-1 4 of 6 layer construction, also includes a number of public facil

4、ities such as waste recycling, underground parking, underground defense facilities, basketball courts, leisure and entertainment district. 2When I went to the site, the main has been completed into the renovation phase and the municipal drainage engineering drawings for approval, b1-1 4, b2-1 4, c1-

5、1 4 c2-1 4 has entered the interior decoration and wall tiling, d1 - d2 interior build walls and external wall finishes, and d3 is the main floor to the first day of the 9th floor to the site to become familiar with the venue the next day, the project manager arranged for us to do the internship qua

6、lity security guards, the main The job is to supervise the quality and safety of the site, where the quality of the construction process quality inspection, safety refers to the insecurity of the construction site inspection and safety production supervision and after to the construction site organi

7、zed more work in the observation with the construction of the surface, d3 buildings on the floor, d1-d2 in the puzzle wall, b1-1 4, b2-1 4, c1-1 4, c2-1 4 in the interior decoration and exterior wall ready before the tiling and construction of municipal works. This can greatly speed up the construct

8、ion schedule, to avoid a slowdown, the phenomenon. Wall masonry works on the construction site 3observation d1-the d2 Building Building, the main frame has been completed interior brick masonry has completed a 3 layer 4-layer construction. Mining steel derrick vertical lift transport of materials Th

9、e wall does not participate in load-bearing, 24 thickness of the wall, brick wall material is composed of sand-lime brick and cement mortar. Sand-lime brick selection of specifications for 240 * 115 * 53 mu5 mainly required to meet strength and durability requirements for the quality of the sand-lim

10、e brick. Using cement mortar mix ratio for m7.5, the Mortar quality requirements mainly to meet the workability of the segregation phenomenon. Masonry to process the request: (1) copy level build walls hit the bottom level and m7.5 cement mortar base copy level, its purpose is to allow the bottom at

11、 the same level. (2 actinomycetes mainly to set the location of the edge of the wall and window and door openings, in order to ensure that each floor walls of the axis of the re-merger basis axis. 4(3) put brick to brick along scheduled axis of the display, the purpose is placed after the irregular

12、can http:/shixi.exam8/ adjustment. (4 Li leather number of rods and the rod of the number of hang alignment skin is to use it to control the level of each skin of brick, the control of embedded parts, holes of doors and windows, floor, beam, etc. elevation. (5 bricklaying. Requirements: the quality

13、of the wall masonry cracks between the blocks must be horizontal level, vertical, staggered joint overlap, to avoid through the seam, Zhuanfeng mortar must be full, uniform thickness. Wall construction should pay attention to: (1 lap shear wall junction, application to set aside the pull then the te

14、ndon and masonry wall, use the pull then reinforced aimed at improving the integrity of the wall. (The detailed structure of the wall has a door and window lintels, this article from the internship report net when the upper load is too large to be added to set the reinforcement should be located rei

15、nforced to improve the bearing capacity. 5Second, the wall facing engineering community b1-1 4, b2-1 4, c1-1 4, c2-1 4-door window frame has been installed, the ongoing interior decoration work, following in the construction the field have learned: (A wall plaster works interior wall plaster and ext

16、ernal wall finishes, Within the wall plaster: Material selection: , cement selection of more than 32.5 # ordinary portland cement. , sand the selection of sand. steel mesh , split bricks, tiles. Labor force: each assignment the plaster work and handyman, wall plastering is generally composed by the layer of the bottom, middle and finishes: