建筑施工承插型盘扣式钢管支架轴心受压构件的稳定系数、脚手架施工验收记录

上传人:木** 文档编号:184552249 上传时间:2021-06-22 格式:DOCX 页数:5 大小:50.67KB
返回 下载 相关 举报
建筑施工承插型盘扣式钢管支架轴心受压构件的稳定系数、脚手架施工验收记录_第1页
第1页 / 共5页
建筑施工承插型盘扣式钢管支架轴心受压构件的稳定系数、脚手架施工验收记录_第2页
第2页 / 共5页
建筑施工承插型盘扣式钢管支架轴心受压构件的稳定系数、脚手架施工验收记录_第3页
第3页 / 共5页
建筑施工承插型盘扣式钢管支架轴心受压构件的稳定系数、脚手架施工验收记录_第4页
第4页 / 共5页
建筑施工承插型盘扣式钢管支架轴心受压构件的稳定系数、脚手架施工验收记录_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

《建筑施工承插型盘扣式钢管支架轴心受压构件的稳定系数、脚手架施工验收记录》由会员分享,可在线阅读,更多相关《建筑施工承插型盘扣式钢管支架轴心受压构件的稳定系数、脚手架施工验收记录(5页珍藏版)》请在金锄头文库上搜索。

1、Error! No text of specified style in document.附录A (资料性)轴心受压构件的稳定系数表D.1 Q235钢管轴心受压构件的稳定系数012345678901.0000.9970.9950.9920.9890.9870.9840.9810.9790.976100.9740.9710.9680.9690.9630.9600.9580.9550.9520.949200.9470.9440.9410.9380.9360.9330.9300.9270.9240.921300.9180.9150.9120.9090.9060.9030.8990.8960.893

2、0.889400.8860.8820.8790.8750.8720.8680.8640.8610.8580.855500.8520.8490.8460.8430.8390.8360.8320.8290.8250.822600.8180.8140.8100.8060.8020.7970.7930.7890.7840.779700.7750.7700.7650.7600.7550.7500.7440.7390.7330.728800.7220.7160.7100.7040.6980.6920.6860.6800.6730.667900.6610.6540.6480.6410.6340.6260.6

3、180.6110.6030.5951000.5880.5800.5730.5660.5580.5510.5440.5370.5300.5231100.5160.5090.5020.4960.4890.4830.4760.4700.4640.4581200.4520.4460.4400.4340.4280.4230.4170.4120.4060.4011300.3960.3910.3860.3810.3760.3710.3670.3620.3570.3531400.3490.3440.3400.3360.3320.3280.3240.3200.3160.3121500.3080.3050.301

4、0.2980.2940.2910.2870.2840.2810.2771600.2740.2710.2680.2670.2620.2590.2560.2530.2510.2481700.2450.2430.2400.2370.2350.2320.2300.2270.2250.2231800.2200.2180.2160.2140.2110.2090.2070.2050.2030.2011900.1990.1970.1950.1930.1910.1890.1880.1860.1840.1822000.1800.1790.1770.1750.1740.1720.1710.1690.1670.166

5、2100.1640.1630.1610.1600.1590.1570.1560.1540.1530.1522200.1500.1490.1480.1460.1450.1440.1430.1410.1400.1392300.1380.1370.1360.1350.1330.1320.1310.1300.1290.1282400.1270.1260.1250.1240.1230.1220.1210.1200.1190.1182500.117表D.2 Q355钢管轴心受压构件的稳定系数012345678901.0000.9970.9940.9910.9880.9850.9820.9790.9760.

6、973100.9710.9680.9650.9620.9590.9560.9520.9490.9460.943200.9400.9370.9340.9300.9270.9240.9200.9170.9130.909300.9060.9020.8980.8940.8900.8860.8820.8780.8740.870400.8670.8640.8600.8570.8530.8490.8450.8410.8370.833500.8290.8240.8190.8150.8100.8050.8000.7940.7890.783600.7770.7710.7650.7590.7520.7460.739

7、0.7320.7250.718700.7100.7030.6950.6880.6800.6720.6640.6560.6480.640800.6320.6230.6150.6070.5990.5910.5830.5740.5660.558900.5500.5420.5350.5270.5190.5120.5040.4970.4890.4821000.4750.4670.4600.4520.4450.4380.4310.4240.4180.4111100.4050.3980.3920.3860.3800.3750.3690.3630.3580.3521200.3470.3420.3370.332

8、0.3270.3220.3180.3130.3090.3041300.3000.2960.2920.2880.2840.2800.2760.2720.2690.2651400.2610.2580.2550.2510.2480.2450.2420.2380.2350.2321500.2290.2270.2240.2210.2180.2160.2130.2100.2080.2051600.2030.2010.1980.1960.1940.1910.1890.1870.1850.1831700.1810.1790.1770.1750.1730.1710.1690.1670.1650.1631800.

9、1620.1600.1580.1570.1550.1530.1520.1500.1490.1471900.1460.1440.1430.1410.1400.1380.1370.1360.1340.1332000.1320.1300.1290.1280.1270.1260.1240.1230.1220.1212100.1200.1190.1180.1160.1150.1140.1130.1120.1110.1102200.1090.1080.1070.1060.1060.1050.1040.1030.1010.1012300.1000.0990.0980.0980.0970.0960.0950.

10、0940.0940.0932400.0920.0910.0910.0900.0890.0880.0880.0870.0860.0862500.085附录B (资料性)脚手架施工验收记录使用规定:当脚手架应用于支撑架施工时,其施工验收记录应采用表E.1;当应用于作业架施工时,其施工验收记录应采用表E.2。表E.1 支撑架施工验收记录表项目名称搭设部位高度跨度最大荷载搭设班组班组长操作人员持证人数证书符合性专项方案编审程序符合性技术交底情况安全交底情况钢管支架进场前质量验收情况材质、规格与方案的符合性使用前质量检测情况外观质量检查情况检查内容允许偏差()方案要求()实际情况()符合性立杆垂直度L/500且505水平杆水平度5可调托撑垂直度5插入立杆深度150-5可调底座垂直度5插入立杆深度150-5立杆组合对角线长度6立杆梁底纵、横向间距板底纵、横向间距竖向接长位置基础承载力水平杆纵、横向水平杆设置梁底纵、横向步距板底纵、横向步距插销销紧情况竖向斜杆最底层步距处设置情况最顶层步距处设置情况其它部位剪刀撑垂直纵、横向设置水平向扫地杆设置与已建结构物拉结设置其它施工单位检查结论结论: 检查日期: 年 月 日检查人员: 项目技术负责人: 项目经理:监理单位验收结论结论:

展开阅读全文