《[精选]系统工程管理》由会员分享,可在线阅读,更多相关《[精选]系统工程管理(39页珍藏版)》请在金锄头文库上搜索。
1、系統工程管理,Outline,System Definition What is Systems Engineering? System Engineering Process,System Definition,Hardware,Software,Equipment,Facilities,Technical Data,Personnel,An integrated set of equipment, computer program, facilities, human and logistical support resources, and procedures which are as
2、sembled to accomplish a single purpose or mission. (NSA/CSS) A system is a construct or collection of different elements that together produce results not obtainable by elements alone. (NASA) A complete solution to a defined need(s) in its full environment over a prescribed lifetime. (Northrop Grumm
3、an),Command Control Prototype (product with partial functionality); Engineering unit (fully functional but may not be same form/fit); Design verification test units (form, fit, and function is the same, but they may not have flight parts); Qualification units (identical to flight units but may be su
4、bjected to extreme environments) Flight units (end product that is flown, including proto-flight units).,Environmental Tests,Product Validation Process,End Product To Be Validated,Product Validation Plan,Product Validation Results,Product Validation Work Products,Prepare to Conduct Product Validatio
5、n,Analyze the Outcomes of the product Validation,Validated End Product,Stakeholder Expectation Baseline,Enabling Product,Prepare Appropriate Product Support Documentation,Prepare a Product Validation Report,Capture Work Products from Products Validation,Perform the Product Validation,Product Validat
6、ion Report,Product Transition Process,End Product To Be Transitioned,Delivered End Product with Applicable documentation,Realized Enabling Products,Prepare to Conduct Product Transition,Prepare the End Product for Transition,Documentation To Accompany The Delivered End Product,Enabling Product,Trans
7、ition the End Product to be the Customer with Required Documentation Based on the Type of Transition Required,Prepare Sites, as Required, where the End Product Will Be Stored, Assembled, Integrated, Installed, Used, and/or Maintained,Evaluate the End Product, Personnel, and Enabling Product Readiness for Product Transition,Product Transition Work Products,Capture Product Implementation Work Products,Thanks for your Attention,