2021年职称英语综合类B卷完形填空真题及答案

上传人:郭** 文档编号:169739662 上传时间:2021-02-27 格式:DOC 页数:5 大小:15.55KB
返回 下载 相关 举报
2021年职称英语综合类B卷完形填空真题及答案_第1页
第1页 / 共5页
2021年职称英语综合类B卷完形填空真题及答案_第2页
第2页 / 共5页
2021年职称英语综合类B卷完形填空真题及答案_第3页
第3页 / 共5页
2021年职称英语综合类B卷完形填空真题及答案_第4页
第4页 / 共5页
2021年职称英语综合类B卷完形填空真题及答案_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

《2021年职称英语综合类B卷完形填空真题及答案》由会员分享,可在线阅读,更多相关《2021年职称英语综合类B卷完形填空真题及答案(5页珍藏版)》请在金锄头文库上搜索。

1、职称英语综合类B卷完形填空真题及答案 xx职称英语综合类B卷完形填空真题及答案 The Worlds Longest Bridge Rumor has it that1 a legendary sixheaded monster lurks in the deep waters of the Tyrrhenian Sea between Italy and the island of Sicily._ (1)_ When pleted in xx,the world s longest bridge will weigh nearly 300,000 tonsequivalent to the

2、 i _berg that sank the Titanicand stretch 5 kilometers long.“Thats nearly 50 per _nt longer than any other bridge ever built,”says structural engineer Shane Rixon. _(2) _They re suspension bridges, _ssive structures built to span vast water channels or gorges.A suspension bridge needs just two tower

3、s to shoulder the structures _mmoth weight,thanks to hefty supporting cables slung between the towers and anchored firmly in deep pools of _ment at each end of the bridge.The Messina Strait Bridge will have two 54,100-ton towers,which will support most of the bridge s load.The beefy cables of the br

4、idge.each 1.2 meter in diameter, will hold up the longest and widest bridge deck ever built. When construction begins on the Messina Strait Bridge in xx,the first job will be to erect two 370 meter-tall steel towers._(3)_ Getting these cables up will be something2.It s not just their lengthtotally 5

5、.3 kilometersbut their weight._(4)_ After lowering vertical“ suspender ”cables from the _in cables.builders will erect a 60 meter-wide 54.630-ton steel roadway, or deckwide enough to aommodate 12 lanes of traffic.The decks weight will pull down on the cables with a for _ of 70,500 tons.In return,the

6、 cables yank up against their firmly rooted anchors with a for _ of 1 39。000 tonsequivalent to the weight of about 100,000 cars.Those anchors are essential._(5)_ 注释: 1. Rumor has it that :传说中的 Rumor has it that 这是一种固定结构。it 是宾语,that 引导的从句具体说明 it 的内容。 2. something :值得重视的人或事 练习: A. Some enviro _entalis

7、ts are against the project on biological grounds. B. What do the worlds longest bridges have in mon? C. If true,one day you might spy the beast while zipping(呼啸而过)across the Messina Strait Bridge. D. Theyre what will keep the bridge from going anywhere. E. The second job will be to pull two sets of

8、steel cables across the strait,each set being a bundle of 44,352 individual steel wires. F. They will tip up the scales at 166,500 tonsmore than half the bridges total _ss. 答案与题解: 1. C 选项C中有一个关键词beast,与第一句中的monster相呼应。所以,C是答案。 2. B 第二段第二句的主语是 They。由于表语是suspension bridges,They 替代的一定是前面句子出现过的bridges。六个选项中,只有B含有bridges。填在第二段段首,意思连贯。 3. E “空3”前面的句子中有 the first job 这几个词。有first,必有second/then。六个选项中,只有E含有The second job。所以,E是答案。 4.F “空4”前面的句子说的是,把这些吊索吊高定位是有难度的,不仅仅由于它们很长,还由于它们很重。F具体地介绍了它们的重量,应该是“空4”前面的句子的后续句。 5.D “空5”前面的句子说的是,桥桩很重要。 _很重要呢?D解释了桥桩的作用,意思连贯,所以是答案。 模板,内容仅供参考

展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 办公文档 > 其它办公文档

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号