值班机工英语题库{长江海事局}_第三章

上传人:飞*** 文档编号:16303319 上传时间:2017-11-07 格式:DOC 页数:9 大小:40.50KB
返回 下载 相关 举报
值班机工英语题库{长江海事局}_第三章_第1页
第1页 / 共9页
值班机工英语题库{长江海事局}_第三章_第2页
第2页 / 共9页
值班机工英语题库{长江海事局}_第三章_第3页
第3页 / 共9页
值班机工英语题库{长江海事局}_第三章_第4页
第4页 / 共9页
值班机工英语题库{长江海事局}_第三章_第5页
第5页 / 共9页
点击查看更多>>
资源描述

《值班机工英语题库{长江海事局}_第三章》由会员分享,可在线阅读,更多相关《值班机工英语题库{长江海事局}_第三章(9页珍藏版)》请在金锄头文库上搜索。

1、1其他考试/ 值班机工 第三章03012001B5We often proceed into a shipyard for _ of the year.A、annual repair in the end B、annual repair at the end C、annual repair the end D、annual repair with end 03042002B5Were _ fresh water and stores now, so we are going to take in some _.A、short for/ at our next port of call B、sh

2、ort of / at our next port of call C、short of/ at next port of our call D、short for/ at next port of call 03012003C5Itll take _ much time _ all the worn out parts.A、we/ replace B、us/ replace C、us/ to replace D、we/ replace 03032004A5Your engine room looks _.A、clean and tidy B、cleanly and tidily C、clea

3、ning and tidying D、cleaned and tidied 03032005C5There is a loose screw, please _ it at once.A、loosen B、tight C、tighten D、weld 03012006B5The workers can hardly find a new valve to replace the old one, _? A、cant they B、can they C、can the workers D、cant the workers 03012007B52The worker is _ repairing

4、the machine to notice my coming.A、enough busy B、too busy C、busy too D、busy enough 03012008B5Would you please be _ to help me with the welding machine? A、enough B、kind enough C、too kind D、enough kind 03022009A5The chief engineer asked me to write a _.A、two-hundred-word survey report B、two-hundred-wor

5、ds survey report C、two-hundreds-words survey report D、two hundreds of words survey report 03042010D5Our marine spare parts and stores are _.A、good quality B、good with quality C、good of quality D、good in quality 03042011C5_ hammer do you prefer, this one or that one? A、What B、How C、Which D、whose 0303

6、2012C5Ill _ to meet your requirements when I do my maintenance work.A、do me a best B、do the best C、do my best D、try me a best 03042013C5This is not a spanner and that isnt a spanner, _.A、too B、neither C、either D、also 303012014C5They _ the piston of the cylinder for inspection during the repair last

7、time.A、opened B、got C、lifted out D、rolled out 03012015C5They _ the cylinder for inspection.A、opened B、get C、dismantled D、put 03042016B5Would you please supply _ the following spare parts and stores before our departure.A、my vessel for B、my vessel with C、mine vessel for D、mine vessel with 03042017A5Y

8、ou will find our price of the ships stores_.A、fair and reasonable B、fairly and reasonably C、are fair and reasonable D、are fairly and reasonably 03032018A5Theyll do_ cleaning work in the engine room this afternoon.A、some B、many C、a few D、any 03022019C5Sorry to have kept you _ a long time, Mr. Surveyo

9、r.A、wait for B、waiting C、waiting for D、waited 03042020C5Please _ the spare parts on board on Friday as early as possible.A、carry out B、delivery 4C、deliver D、bring 03012021B5We _ the engine trial after the ship is repaired.A、carry out B、shall carry out C、carry D、shall carry 03032022A5The third engine

10、er repaired _ oil pump with the motormen _.A、the damaged/ the day before yesterday B、the damaged/ the day after tomorrow C、the damaging/ day after the tomorrow D、the damaging/ day before the yesterday 03012023C5They _ the annual repair last month.A、carried on B、carry out C、carried out D、carry on 030

11、12024B5The chief engineer _ out the repair list yet.A、have not worked B、has not worked C、didnt not work D、doesnt work 03032025D5They _ the worn-out parts with the ships spare yesterday.A、have not renewed B、will not renew C、are not renewing D、did not renew 03032026D5Everyone is busy in the engine roo

12、m, _ carefully.A、to do maintenance works B、to do maintenance work C、doing maintenance works D、doing maintenance work 03032027D55All nuts and bolts _ with care when you reassemble the engine.A、has to be tightened B、will tighten C、have to tighten D、must be tightened 03032028D5The nuts and bolts _ with

13、 special tools carefully.A、must be proper tightened B、have to be proper tightened C、must to be properly tightened D、have to be properly tightened 03032029C5The clearance between pistons and cylinder liners _ two hours ago.A、is measured B、is being measured C、was measured D、has been measured 03012030B

14、5How about _ the generators first? A、to repair B、repairing C、repairs D、repair 03012031C5What about _ these pipes tomorrow morning? A、remove B、to remove C、removing D、removed 03012032B5After the replacement and _, they reassembled the cylinder.A、clean B、cleaning C、cleaned D、to clean 03042033A5These tw

15、o spare parts _, but they are of the same specification.A、are not of the same brand B、are not the same brand C、dont the same brand D、dont of the same brand 603012034A5Before docking, please inform us of the quantity and distribution of_.A、the fuel and water B、the stores and spare parts C、machines and equipment D、valves and pipes 03012035A5According to the repair list, you should replace these _.A、corroded pipes B、corroding pipes C、corroded pipe D、corroding pipe 03032036B5The generator often

展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 中学教育 > 其它中学文档

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号