1、,Saturnapplication,Gas distribution21st November 2005,Riunione DS AL,15 Dicembre 2005,Saturn installation,Location in downtown Milano, 21st November 2005,Riunione DS AL,15 Dicembre 2005,Saturn installation,Location in downtown Milano, 21st November 2005,Riunione DS AL,15 Dicembre 2005,Saturn install
2、ation,Existing main line, welding done by trained welders, “key” the very small tranch size!,Riunione DS AL,15 Dicembre 2005,Saturn installation,Mr. Speroni, technical manager AEM, decision maker, choiceSaturn for all these applications in AEM without any tender.Strategic product!,Riunione DS AL,15
3、Dicembre 2005,Saturn installation,Positioning,Riunione DS AL,15 Dicembre 2005,Saturn installation,Hand scraping, no specific and automatic tools,Riunione DS AL,15 Dicembre 2005,Saturn installation,Ready to be weld, one man working only!,Riunione DS AL,15 Dicembre 2005,Saturn installation,Check of th
4、e valves spigot insertion dept,Riunione DS AL,15 Dicembre 2005,Saturn installation,PE valve supplied by Glynwed, 30% lower in price than our purchase price. Welding unit from Glynwed, 1.000 !,Riunione DS AL,15 Dicembre 2005,Saturn installation,Valve installation and positioning,Riunione DS AL,15 Dic
5、embre 2005,Saturn installation,ELGEF Plus barcode reading, easy, fast, and simplenot adhesive label on the fitting!,Riunione DS AL,15 Dicembre 2005,Saturn installation,Drilling device cutter head from Pipetech, customized with AEM drawings,Riunione DS AL,15 Dicembre 2005,Saturn installation,Extensio
6、n stem to adapt for PE valves, customized with AEMdrawings (all the drawings were made by Mr. Speroni),Riunione DS AL,15 Dicembre 2005,Saturn installation,Pipetech drillingdevice, NON standardItem!,Riunione DS AL,15 Dicembre 2005,Saturn installation,Pipetech drilling device, pressure valve and fitti
7、ng,Riunione DS AL,15 Dicembre 2005,Saturn installation,Welding process,Riunione DS AL,15 Dicembre 2005,Saturn installation,Welding process with written notes,Riunione DS AL,15 Dicembre 2005,Saturn installation,Tool preparation,Riunione DS AL,15 Dicembre 2005,Saturn installation,Cutter head for PE,Ri
8、unione DS AL,15 Dicembre 2005,Saturn installation,Prepare to be installed,Riunione DS AL,15 Dicembre 2005,Saturn installation,Cutting underpressure 50 mbar,Riunione DS AL,15 Dicembre 2005,Saturn installation,Out of the cutter and valve closing,Riunione DS AL,15 Dicembre 2005,Saturn installation,PE p
9、iece into the cutter, no pieces into the pipe,Riunione DS AL,15 Dicembre 2005,Saturn installation,Valve ready tobe weld on the connection,Riunione DS AL,15 Dicembre 2005,Saturn installation,Total work made in 1 hour2 people involvedNo stop of gas distributionVery small tranch sizeNo traffic vehicle
10、stopMade during working hours, from 09.45 AM to 10.45 AM less cost than in the nightSafe job Very well done drilling unit, simple and safe,Riunione DS AL,15 Dicembre 2005,Saturn installation,Before AEM needs to make a very big tranchNeeds of by pass4 stop off bag4 air release saddlesMin. 14 weldsTim
11、e 1 day, 4 people, better if made during the night (extra cost)Needs of very well trained welder! Vehicle stop,Riunione DS AL,15 Dicembre 2005,Saturn installation,For all these reason now SATURN it is a strategic choice in AEM.From d 180 to d 315 mm, min. 300 pcs. per yearUsed less on lower diameters,