《(工程质量)管道工程施工质量管理细则中英文)206KB85586305精品》由会员分享,可在线阅读,更多相关《(工程质量)管道工程施工质量管理细则中英文)206KB85586305精品(33页珍藏版)》请在金锄头文库上搜索。
1、QUALITY MANAGEMENT DETAIL RULES ON PIPING CONSTRUCTION CONTRACT管道工程合同施工质量管理细则合同编号: Number of Contract:目录Content1.0编制目的及适用范围Purpose for Preparation and Scope of Application2.0 编制原则Principles for Preparation3.0 执行标准及有关规定Applicable Standards and Relevant Regulations3.1 中国政府的相关法规和政策Relevant laws, regula
2、tions and policies issued by Chinese government:3.2 SECCO项目IPMT质量体系有关文件Documentation related to IPMT quality system of SECCO project:3.3 SECCO项目IPMT规定和要求IPMT regulations and requirements of SECCO project:3.4 施工验收标准及规范Standards and codes for construction acceptance:4.0 冲突和协调Conflict and Coordination5
3、.0 专业技术经理与专业工程师Specialist Technical Manager and Specialist Engineer5.1 专业技术经理Specialist technical manager5.2专业工程师Specialist engineer6.0HSE7.0 施工过程中工程施工质量的控制Quality Control in the Process of Construction7.1 主要依据Main basis7.2 熟悉现场管理体系、建立工作接口Acquaintance with site management system and establishment of
4、 working interface7.3 技术准备Technical Preparations7.4 组织设计交底Organization Design Briefing7.5 图纸与设计文件会审Joint Check-up of Drawings and Design Documents7.6 审查施工组织设计和施工方案Check-up of Construction Organization Design and Construction Plan7.7 施工过程的质量控制点的制定和检查程序Procedures for the Establishment and Inspection o
5、f Quality Control Points in the Construction Process7.8 施工过程中的质量控制Quality Control During the Construction Process7.8.1 原材料的检查与验收原则Principles for the Inspection and Verification of Raw Materials7.8.2管子抽检的内容和比例Contents and Percentage of Pipe Spot-check7.8.3 其他管道组成件抽检的内容和比例Spot-check Contents and Perce
6、ntage of Other Pipe Components7.8.4 阀门的检验与试验(包括管道视镜、过滤器及阻火器检验)Valve Inspection and Experiment (Including the inspection of pipe signt glass, strainer and flame arrestor)7.8.5采用的主要管道器材标准(规范)Major Piping Specifications Standards (or codes)7.8.5.1材料标准 Material Standards7.8.5.1.1无缝钢管Seamless Steel Pipe7
7、.8.5.1.2焊接钢管Welded Steel Pipe7.8.5.1.3管件Pipe fittings7.8.5.1.4联接件Pipe joints7.8.5.1.5阀门Valves7.8.5.2应用规范Application specification7.8.5.2.1管子Pipe7.8.5.2.2管件Pipe fittings7.8.5.2.3 联接件Pipe joints7.8.5.2.4阀门Valves7.8.6 管道防腐Pipingcorrosion prevention7.8.7 管道的预制加工工艺Pre-fabrication process for pipe7.8.8 碳素
8、钢管道焊接、热处理及质量检查Welding, heat treatment and quality inspection for carbon steel pipe7.8.9 阀门安装Valve installation7.8.10 低温材料检验及安装Cryogenic material inspection and installation7.8.11 静电接地安装Static grounding erection7.8.12 管道系统试验、吹除与清洗Test, purging and cleaning for piping system7.8.13 工程中间交接Engineering in
9、termediate takeover7.8.14 竣工验收Completion acceptance7.9 专业工程师应保存的资料Documents to be retained by specialist engineer附录1: 管道安装工程质量控制点Appendix 1 Quality Control Points for Piping Installation Project附录2: 工业管道施工管理台帐Appendix 2 Industrial Piping Construction Management Record Book 1.0编制目的及适用范围:Purpose for P
10、reparation and Scope of Application1.1 本规定适用于上海SECCO 90x104t/a乙烯项目(以下简称SECCO项目)的现场施工质量管理工作。These stipulations are applicable to the site construction quality management of Shanghai SECCO 90x104t/a Ethene Project (hereinafter referred to as SECCO project).1.2本规定是为了明确SECCO项目的现场施工质量管理工作的职责、工作内容、工作流程、方法
11、以及设计、采购、施工的协调,推行现代化、科学化、规范化的项目管理模式而编制的。These stipulations are prepared for the purpose of defining the responsibilities, working contents, operating process and procedures for the site construction quality management of the SECCO project and for coordination among the design, procurement and constru
12、ction, so as to pursue the modernized, scientific and standardized mode for project management.2.0编制原则Principles for Preparation2.1 本细则在项目质量管理目标合理分解、项目质量管理组织已经确立的前提下,以项目的规律效应性和操作实用性为原则编制的。These rules are prepared on the principle of the law effectiveness and operating practicability of the project,
13、under the precondition that the objectives of the project quality management have been reasonably decomposed and the organization of project quality management has been established.2.2本细则注意到质量检验评定中工程划分与WBS分解结构在施工管理中的内在联系,我们强调将两者的划分尽量统一。These rules have given full attention to the inherent links betw
14、een the project component division in the quality inspection and evaluation and WBS decomposed structure in the construction management. We emphasize that the two divisions should be unified as far as possible.2.3 为加强主动控制的力度,本细则建议建立专业施工管理台帐,将施工质量控制纳入现场施工管理体系,专业工程师应参加重要的材料和设备的招标订货会议,了解产品质量、合同技术要求、厂家售
15、后服务及到货情况。以便在施工管理台帐中列出每月到货清单,使材料报检及工程报检工作系统化。In order to strengthen the power of active control, it is recommended by these rules that a specialized construction management record book is established to integrate the construction quality control into site construction management system. It is also suggested that specialist engineers should participate in the bidding and ordering meetings for important materials and equipment to get acqua