《外文翻译--新奥法设计原理在隧道施工中的应用及主要施工工艺》-公开DOC·毕业论文

上传人:zhuma****mei2 文档编号:137045274 上传时间:2020-07-04 格式:DOC 页数:24 大小:125.50KB
返回 下载 相关 举报
《外文翻译--新奥法设计原理在隧道施工中的应用及主要施工工艺》-公开DOC·毕业论文_第1页
第1页 / 共24页
《外文翻译--新奥法设计原理在隧道施工中的应用及主要施工工艺》-公开DOC·毕业论文_第2页
第2页 / 共24页
《外文翻译--新奥法设计原理在隧道施工中的应用及主要施工工艺》-公开DOC·毕业论文_第3页
第3页 / 共24页
《外文翻译--新奥法设计原理在隧道施工中的应用及主要施工工艺》-公开DOC·毕业论文_第4页
第4页 / 共24页
《外文翻译--新奥法设计原理在隧道施工中的应用及主要施工工艺》-公开DOC·毕业论文_第5页
第5页 / 共24页
点击查看更多>>
资源描述

《《外文翻译--新奥法设计原理在隧道施工中的应用及主要施工工艺》-公开DOC·毕业论文》由会员分享,可在线阅读,更多相关《《外文翻译--新奥法设计原理在隧道施工中的应用及主要施工工艺》-公开DOC·毕业论文(24页珍藏版)》请在金锄头文库上搜索。

1、隧道毕业论文NATM tunnel design principle in the construction of major and Construction Technology W.BroereI.The NATM Design Principle1.Tunnel design and construction of two major theoretical and development process Since the 20th century, human space on the ground floor of the growing demand, thus the und

2、erground works of the study of a rapid development. In a large number of underground engineering practice, it is generally recognized that the tunnel and underground cavern project, the core of the problem, all up in the excavation and retaining two key processes. How excavation, it will be more con

3、ducive to the stability and cavern facilitate support : For more support, Supporting how they can more effectively ensure stability and facilitate the cavern excavation. This is the tunnels and underground works two promote each other and check each others problems. Tunnels and underground caverns,

4、and focusing on the core issues with the above practice and research, in different periods, People of different theories and gradually established a system of different theories, Each system includes theory and resolve (or are studying the resolution) from the works of understanding (concept), mecha

5、nics, engineering measures to the construction methods (Technology), a series of engineering problems. A theory of the 20th century the 1920s the traditional load relaxation theory. Its core content is : a stable rock self-stability, no load : unstable rock may have collapsed. need shoring structure

6、 to be supported. Thus, the role of the supporting structure of the rock load is within a certain range may be due to relaxation and collapse of rock gravity. This is a traditional theory, and their representative is Taishaji and Principes and others. It works similar to the surface issues of the th

7、inking is still widely used to. Another theory of the 20th century made the 1950s the modern theory of timbering or rock for the theory. Its core content is : rock stability is clearly bearing rock to their own self-stability : unstable rock loss of stability is a process, and if this process in pro

8、viding the necessary help or restrictions will still be able to enter the rock steady state. This theoretical system of representative characters Labuxiweici, Miller-Feiqieer, Fenner - Daluobo and Kashitenai others. This is a more modern theory, it is already out of the ground works to consider the

9、ideas, and underground works closer to reality, the past 50 years has been widely accepted and applied. demonstrated broad development prospects. Can be seen from the above, the former theory more attention to the findings and the results of treatment : The latter theory is even more attention to th

10、e process and the control of the process, right from the rock for the full utilization of capacity. Given this distinction, which both theory and methods in the process, each with different performance characteristics. NATM theory is rock for the tunnel engineering practice in the representation met

11、hod.2. NATM NATM that the new Austrian Tunneling Method short the original is in New Austrian Tunneling Method, referred to as the NATM. France said it convergence bound or some countries alleged to observe the dynamic design and construction of the basic principles. NATM concept of filibustering Xi

12、weici Austria scholars in the 20th century, Professor age of 50. It was based on the experience of both the tunnel and rock mechanics theory, will bolt and shotcrete combination as a major means of supporting a construction method, Austria, Sweden, Italy and other countries, many practical and theor

13、etical study in the 1960s and patented officially named. Following this approach in Western Europe, Scandinavia, the United States and Japan and many other underground works with a very rapid development, have become modern tunnels new technologies landmark. Nearly 40 years ago, the railway sector t

14、hrough research, design, construction combining, in many construction of the tunnel, according to their own characteristics successfully applied a new Austrian law, made more experience, have accumulated large amounts of data, This is the application stage. However, in the road sector NATM of only 5

15、0%. Currently, the New Austrian Tunneling Method almost become weak and broken rock section of a tunnel construction method, technical and economic benefits are clear. NATM the basic points can be summarized as follows : (1). Rock tunnel structure is the main loading unit, the construction must full

16、y protect the rock, it minimize the disturbance to avoid excessive damage to the intensity of rock. To this end, the construction of sub-section should not block too much, excavation should be used smooth blasting, presplit blasting or mechanical tunneling.(2). In order to give full play to rock the carrying capacity should be allowed to control and rock deformation. While allowing deformation, which can be a rock bearing ring; The other hand, have to limit