1、PartCP Si 210 Di1 Elevator Ctrl No Di1 MT 03 0 Page1 80 FOD Overseas Support Team Field Maintenance DateMAY 2005 Revision 1 Index Part 5 Control Panel Si 210 1 Safety In Control Panel 3 2 Installation Condition 4 2 1Maintenance point at installation condition 4 2 2Cleanliness 4 2 3Looseness 4 2 4Mai

2、ntenance point at MCCB 4 2 5Indication power voltage 4 2 6Looseness 5 2 7Maintenance point at control signal 5 2 8Control signal voltage 5 2 9Resistance control signal 6 3 Condition Of PCB 6 3 1Maintenance point at PCB 6 3 2Condition of PCB 6 4 PCB Function 7 4 1Maintenance point PCB function 7 4 2D

3、OC 120 PCB 7 4 3DPC 112 PCB 9 4 4DPC 130 PCB 11 4 5DPP 101 PCB 15 4 6DPP 120 PCB 16 4 7DPP 121 PCB 17 4 8DPP 130 PCB 18 4 9DPP 131 PCB 19 4 10Function of DPP PCB 19 4 11DOA 100 PCB 21 4 12DCL 242 PCB 22 4 13DOV 200 PCB 30 PartCP Si 210 Di1 Elevator Ctrl No Di1 MT 03 0 Page2 80 FOD Overseas Support T

4、eam Field Maintenance DateMAY 2005 Revision 1 4 14DCV 100 PCB Auto voice synthesizer device 32 4 15DOS 100 PCB Local Supervisory panel 35 4 16DHG 161 PCB 39 4 17DCD 201 203 204 PCB 47 4 18DCD 23X Instruction 58 5 Condition Of Relays Transformer And Reactor 70 5 1Maintenance point of relays 70 5 2Con

5、dition of relays 70 5 3Maintenance point of transformer reactor 70 5 4Maintenance point at brake 70 6 Looseness Heat 72 6 1Maintenance point in regeneration resistance 72 PartCP Si 210 Di1 Elevator Ctrl No Di1 MT 03 0 Page3 80 FOD Overseas Support Team Field Maintenance DateMAY 2005 Revision 1 1Safe

6、ty in control panel Turn off the power supply before you start inspection of the controller And then Lock out must be install the power supply switch Be careful not to touch the power unit while discharge even if you turn off the power supply It normally takes 20 to 30 minutes to discharge PartCP Si

7、 210 Di1 Elevator Ctrl No Di1 MT 03 0 Page4 80 FOD Overseas Support Team Field Maintenance DateMAY 2005 Revision 1 2Installation condition 2 1 Maintenance point at installation condition Check PointTool MethodStandardsCycle Cleanliness Vacuum cleaner brush 1 M LoosenessSpanner screw driver1 M 2 2Cle

8、anliness a Remove all PCBs b Vacuum loose dust and dirt from the control panel a Use compressed air to blow out dirt only when necessary b Doing so could cause flying dust and debris to contaminate the controller For grit and grime use a tack cloth to trap and remove dirt 2 3 Looseness Tighten the f

9、ixing bolts if they are loose 2 4 Maintenance point at MCCB Check PointTool MethodStandardsCycle Indication power voltageTester 10 1 M LoosenessSpanner screw driver1 M 2 5Indication power voltage a Turn on the main switch b Measure the voltage on the secondary side U V W a Between U and V b Between

10、U and W c Between V and W c The voltage should be within 10 of the standard voltage specified for the motor If not inform the customer and ask to the correct voltage a If 220 V is used The voltage measured should be 198 242 V b If 380 V is used The voltage measured should be 342 418 V c If possible

11、measure twice a year peak time and off peak time And compare PartCP Si 210 Di1 Elevator Ctrl No Di1 MT 03 0 Page5 80 FOD Overseas Support Team Field Maintenance DateMAY 2005 Revision 1 2 6 Looseness Tighten the fixing bolts if they are loose 2 7 Maintenance point at control signal Check PointTool Me

12、thodStandardsCycle Control signal voltageTester1 M Resistance control signalMegger tester Over 0 5 12 M 2 8Control signal voltage When P48V is problem turn on the PF LED on DOC 1XX PCB PartTerminalVoltage V Allowance Fuse A Remark Control Brake UB 03 UB 05DC 110 10 156 Relay InputUB 04 UB 01DC 48 10

13、 153 C LONUB 07 UB 02DC 24 10 153 H LONXHA 04 XHA 03DC 24 10 1510 SMPS SMPS 01 SMPS 02 INV FANSMPS 03 SMPS 04 AC110 10 153 5 Within V SMPS 05 SMPS 06AC 110 Gate SMPS SMPS 07Earth 103 DoorUB 08 UB 09AC 100 10 155 LightTML1 10 TML1 12AC 220 10 1510 Rotary Encoder TMLRE 01 TMLRE 02DC 15 5 PartCP Si 210

14、 Di1 Elevator Ctrl No Di1 MT 03 0 Page6 80 FOD Overseas Support Team Field Maintenance DateMAY 2005 Revision 1 2 9 Resistance control signal Once a year measure the insulation resistance between the control signal terminals and the earth wire This is an important maintenance work a Resistance betwee

15、n Light MCCB secondary side and frame Over 0 5 b Resistance between C1ST Contactor secondary side and frame Over 0 5 c Resistance between C1BR Contactor secondary side and frame Over 0 5 3Condition of PCB 3 1 Maintenance point at PCB Check PointTool MethodStandardsCycle Condition of PCBEye hands1 M

16、3 2 Condition of PCB a Inspect the installation condition look for burn and oil stain b Cleaning a Remove the PC b Use the blower and brush to remove excessive dust build up on contacts and connectors c Clean the edge contacts using a lint free wiping cloth PartCP Si 210 Di1 Elevator Ctrl No Di1 MT 03 0 Page7 80 FOD Overseas Support Team Field Maintenance DateMAY 2005 Revision 1 4PCB Function 4 1 Maintenance point PCB function Check PointTool MethodStandardsCycle FunctionMegger tester1M 4 2 DOC