BSCM 105道试题.doc

上传人:灯火****19 文档编号:134975428 上传时间:2020-06-10 格式:DOC 页数:17 大小:25.95KB
返回 下载 相关 举报
BSCM 105道试题.doc_第1页
第1页 / 共17页
BSCM 105道试题.doc_第2页
第2页 / 共17页
BSCM 105道试题.doc_第3页
第3页 / 共17页
BSCM 105道试题.doc_第4页
第4页 / 共17页
BSCM 105道试题.doc_第5页
第5页 / 共17页
点击查看更多>>
资源描述

《BSCM 105道试题.doc》由会员分享,可在线阅读,更多相关《BSCM 105道试题.doc(17页珍藏版)》请在金锄头文库上搜索。

1、BSCM Sample TEST.1. Which of the following demand fulfillment approaches typically provides the longest delivery time ?A) Engineer-to-order. B) Make-to-order.C) Assemble-to-order. D) Make-to-stock.2. Which of the following is generally a characteristic of a product-focused layout ?A) Large queues at

2、 workstations. B) Fixed flow of work.C) Production to a work order. D) General purpose workstations.3. Which of the following is generally a function of the physical distribution system ?A) Production activity control. B) Production planning.C) Packaging. D) Bill of material.4. Forecasts are typical

3、ly more accurate for the near future than they are for the longer future. This occurs becauseA) The near term holds less uncertainty than the long term.B) More data is available in the near term.C) Aggregate data is easier to forecast.D) The future is more dynamic in the near term.5. A forecast is t

4、ypically more accurate forA) Groups of items rather than for individual items.B) Daily rather than monthly periods of time.C) Physical units rather than monetary units.D) Far out in the future rather than nearer time periods.6. An anticipated build schedule can be BEST described asA) Production plan

5、. B) Capacity plan.C) Materials requirements plan. D) Master production schedule.7. Which of the following is MOST likely to be a dependent demand item ?A) A manufactured subassembly. B) An item in a grocery store.C) A service part. D) An office supply item.8. Which of the following manufactured pro

6、duct types are BEST suited for flow manufacturing ?A) Wide range of disparate products.B) Limited range of similar products.C) Low volume of similar products.D) High volume of disparate products.9. The master production schedule is generally a direct input toA) Production planning. B) Material requi

7、rements planning (MRP).C) Purchasing planning D) Production activity control (PAC).10. A company needs to produce 4000 units over the next two months. There are 21 working days in thefirst month and 19 working days in the second month. What must the daily rate be with a level strategy?A) 50 B) 75 C)

8、 100 D) 12511. The portion of a companys inventory and planned production which is not already committed isA) Inventory allocation. B) Inventory commitment.C) Available to promise. D) Multi-plant planning.12. Final assembly scheduling usually occurs whenA) A customer order is received. B) Planning a

9、 build schedule.C) The MPS is established. D) Capacity is constrained.Item 13 is based on the following data.Beginning inventory = 200 unitsEnding inventory = 200 unitsSales forecast:Month 1 2 3 4 5Quantity 200 300 200 400 30013. What is the required monthly production to achieve level production ?A

10、) 220 units B) 240 units C) 280 units D) 340 units14. In order for a forecast to signal negative bias, the tracking signal would beA) Less than one. B) More than one. C) Equal to one. D) Equal to zero.15. Which of the following identifies the demand for capacity at a work center in a specific time p

11、eriod ?A) Bill of labor. B) Dispatch list.C) Scheduled receipts. D) Work center load.16. A forecast analyst has just extracted the recent actual sales history and, in reviewing the data, notices several outliers. The analyst should most likelyA) Rerun the data to ensure there were no errors in the e

12、xtract.B) Rerun the data but remove the outliers.C) Ignore the outliers and use the forecasts as is.D) Refer to the tracking signal.Items 17 and 18 are based on the following indented bill of material.Level Part Quantity per0 A not applicable1 B 22 C 22 E 21 C 41 G 417. How many units of part C are

13、required to produce one unit of part A ?A) 2 B) 4 C) 6 D) 818. Which of the items in the bill of material are parents ?A) A only. B) B, C, and G only.C) A and B only. D) A, B, C, and G only.19. The primary reason for a time fence is toA) Determine how to use the forecast.B) Manage schedule changes m

14、ost effectively.C) Provide a stable schedule for the suppliers.D) Maintain a steady shipment schedule.20. The setup time for an operation is two hours and the run time is 10 minutes per piece. The scheduled operation time for 100 units isA) 130 minutes. B) 1,000 minutes. C) 1,100 minutes. D) 1,120 m

15、inutes.21. Which of the following is NOT an input to MRP ?A) Master Production Schedule. B) Inventory records.C) Bill of f materials. D) Capacity planning.22. Material requirements planning (MRP) schedules a planned order receipt whenA) A gross requirement exists. B) A net requirement exists.C) An e

16、xception is generated. D) Safety stock is zero.23. A firm planned order is used toA) Freeze the planned order against changes in quantity and time.B) Convert the planned order to a scheduled receipt.C) Simulate the projected inventory balance.D) Manipulate the data and quantity of the customer order.24. A closed loo

展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 中学教育 > 其它中学文档

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号