德桂苑施工方案.doc

上传人:自*** 文档编号:124912156 上传时间:2020-03-14 格式:DOC 页数:157 大小:784KB
返回 下载 相关 举报
德桂苑施工方案.doc_第1页
第1页 / 共157页
德桂苑施工方案.doc_第2页
第2页 / 共157页
德桂苑施工方案.doc_第3页
第3页 / 共157页
德桂苑施工方案.doc_第4页
第4页 / 共157页
德桂苑施工方案.doc_第5页
第5页 / 共157页
点击查看更多>>
资源描述

《德桂苑施工方案.doc》由会员分享,可在线阅读,更多相关《德桂苑施工方案.doc(157页珍藏版)》请在金锄头文库上搜索。

1、program is enacted, implementation of in-house security training programmes managed by the authority; responsible for the regulated enterprises new project preparation, proactive coordination, responsible for new employee safety, technical training; (I) the construction, reconstruction and expansion

2、 engineering design, construction, commissioning process management, supervision of construction and expansion project ready for production work; ensure that relevant state labor safety and industrial sanitation simultaneously with the principal part of the project design, construction, and commissi

3、oning procedure implementation; (J) development of production information management system, establishing and perfecting the company produces information management network, post production operation management information in a timely manner, guiding the enterprises to develop information exchange;

4、(11) to contribute to the safety offered to praise or reward, to have those responsible for the accident, be criticized and punished; (12) actively promote the safety quality standardization, clean production work, exploring new management methods and means of production safety, establishing the lon

5、g-term mechanism of safe production; (13) according to the carbon company, combined with the companys actual, organized safety evaluation, critical incident management, technology monitoring, dam safety, reliability, management, flood control and other safety work, and check for implementation; (14)

6、 in its investigation on an accident of personal death and above; unit of organization that belong to major accidents investigation; typical accident analysis system of the company, develop corrective actions. Supervision of four no principles implementation; complete accident statistics, analysis,

7、and reporting; Eighth: Workshop safety responsibilities for related infrastructure projects in the area of safety supervision, guidance, coordination, and assume the corresponding responsibility. (A) the implementation of national safety-related laws, regulations and industry codes, standards, super

8、vision of implementation; (B) in accordance with the regulations to the relevant departments for safety information, and to communicate and coordinate with the relevant departments on relevant issues; (C) supervision of dam safety and flood prevention work and timely reporting to the carbon company

9、relevant information; (D) urged to report carbon the rules of safety indicators, reflect the internal safety critical issues; (E) the production of safe and civilized construction and infrastructure projects, such as checks, and urge rectification of identified problems, significant problems in time

10、 to report to the company; (F) the related security supervision, inspection, assessment, technology monitoring, reliability, management found in . (A) implementation of safety laws, regulations and safety regulations, requirements for parent company. Make perfect production safety rules, regulations

11、 and procedures; (B) according to the request of the parent company, this annual safety targets and implementation; (C) establish and improve the responsibility system for production safety at all levels strengthen safety assurance system and the functions of the security monitoring system; three-le

12、vel safety net role into full play; four to realize safety production control; (D) establishment of safety education and training system and dynamic assessment mechanism, enhance employees 德桂苑 工程施工招标投标文件项目编号: 正益2006-ZB0628 项目名称: 德阳禾顺房地产开发有限公司德桂苑 投标文件内容: 投标文件技术部分 投标人: 德阳市东方兴发建筑有限公司 (盖公章) 法定代表人或其委托代理人

13、: (签字或盖章) 日 期: 二00六 年 七 月 五 日第一章 工程概况一、编制依据1、根据德桂苑的招标文件。2、根据德阳华景设计有限公司设计的德桂苑施工图一套。3、现场实地踏勘情况。4、国家现行施工及验收规范、质量验收评定标准、施工操作规程、文明施工等相关法规。5、我公司总结和积累的技术经验,机械设备的具体情况,企业的一系列管理制度。6、本工程将要采用的技术规范及规程:普通混凝土用砂质量标准及检验方法 (JGJ5292)普通混凝土用碎石或卵石质量标准及检验方法 (JGJ5392)普通混凝土配合比设计技术规定 (JGJ5581)混凝土外加剂应用技术规定 (GBJ11988)混凝土强度检验评定

14、标准 (GBJ10787)预制混凝土构件质量检验评定标准 (GBJ32190)建筑工程施工质量验收统一标准 (GB503002001)地基与基础工程施工质量验收规范 (GB502022002)砌体工程施工质量验收规范 (GB502042002)混凝土结构工程施工质量验收规范 (GB502052002)屋面工程施工质量验收规范 (GB502072002)建筑地面工程施工质量验收规范 (GB502092002)建筑装饰装修工程施工质量验收规范 (GB5020102001)建筑给排水与采暧工程施工质量验收规 (GB502422002)建筑电气工程施工质量验收规范 (GB503032002)建筑施工安

15、全检查标准 (JGJ5999)建设工程施工现场供用电安全规范 (GB5019493)施工现场临时用电安全技术规范 (JGJ462005)建筑施工高处作业安全技术规范 (JGJ8091)建筑工程冬期施工规程 (JGJ10197)建筑施工扣件式钢管脚手架安全技术规范 (JGJ1302001)注:施工组织设计中未注明尺寸计量单位的均为mm。二、编制思路本工程的施工组织设计按照我公司ISO9001-2000认证的质量管理体系要求,结合项目法施工管理的实际情况,从施工全过程所涉及的“人员”因素、“材料”因素、“方法”因素、“环境”因素等方面,对工程施工进行全方位的安排、部署。三、编制重点本工程的质量、进度、安全、文明施工等,受到各界的观注,我公司应采取切实有效的具体措施,科学管理,精心施工,与甲方友好合

展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 办公文档 > 解决方案

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号