1、CSPC Debottlenecking Project CSPC-Foster Wheel PMTMS-8710-0023-6008 REV. 00 Page 1 / 16Method Statement For Insulation目录 Contents一、目的 Objective 2二、编制依据 Compilation basis .2三、保温施工准备及工序 Insulation construction preparation and process.2四、 岩棉保温施工程序 Insulation of mineral wool construction procedure.3 五、P

2、IR/PUR 玻璃纤维的保温施工程序 PIR/ PUR or cellular glass construction procedure.5六、保冷发泡类施工程序 Foam up cold insulation method statement.7 七、施工质量及安全措施 Construction quality and safety measures.8八、施工机具计划 Construction equipment program .12CSPC Debottlenecking Project CSPC-Foster Wheel PMTMS-8710-0023-6008 REV. 00 Pa

3、ge 2 / 16Method Statement For Insulation一、目的 Objective为保证 EOEG 管道设备的保温保冷工作的工程质量,特编制此方案。This program is compiled to ensure the construction quality about insulation cold/heat work of EOEG piping.本工程主要工作量如下:管线保温 87.75m3,管线保冷 32.19 m3,设备保温,0.53 m3,设备保冷,8.36 m 3二、编制依据 Compilation basis1. SP-8440-0000-61

4、02 Specification for Hot Insulation2. SP-8440-0000-6103 Specification for Cold Insulation3. DEP 31.46.00.31 ACOUSTIC INSULATION FOR PIPING4. CSPC 下发的施工用图 The construction drawings issued by CSPC5. 工业设备及管道绝热工程及验收规范 (GBJ126-89)The acceptance norms of Industrial equipment and pipe insulation works(GBJ1

5、26-89 ) 6. 石油化工隔热工程施工工艺标准 (SH/73522-2003 )Construction Technology for Petrochemical insulation standards (SH/73522-2003 )7. 石油化工设备和管道隔热技术规范 (SH/3010-2000) Insulation technical specifications for Oil-chemical equipment and pipe (SH/3010-2000)8. 石油化工施工安全技术规程 (SH3505-1999)The construction safety techni

6、cal regulations for oil-chemical industry (SH3505-1999)9. 石油化工有毒,可燃介质管道工程施工及验收规范 (SH3501-2002 )The acceptance norms of toxic, flammable medium about Petroleum and Chemical pipe construction (SH3501-2002)三、 保温施工准备及工序 Construction preparation and process for Insulation 1、本装置保温工作作业时间短,合理利用施工时间是保证施工工期的关

7、键。由于工艺管道大部分在预制车间内预制,保温工作拟根据图纸进行提前下料。The operating time of heat insulation is short, the reasonable use of working hours is the key to meeting the construction schedule. As the prefabrication of pipe is in the workshop, the insulation work to be carried out according to drawings in CSPC Debottlenecki

8、ng Project CSPC-Foster Wheel PMTMS-8710-0023-6008 REV. 00 Page 3 / 16Method Statement For Insulationadvance2、施工准备 Construction preparationa. 绝热所用材料,必须按设计文件的规定进行检查验收。绝热材料及其制品,必须具有产品质量证明书出厂合格证、理化检测报告原件,其规格、性能应符合设计要求。然后把符合要求的质保书提交给 PMT QC 部门。The insulation materials must be inspected and accepted accor

9、ding to the designed documents. The Insulation material and its products must have an original certificate of product quality and factory certification, physical and chemical test report, its specifications, performance should meet the design requirements, then submit the material document to QC of

10、the PMT for approve.b. 对产品质量有怀疑时,供货商应进行复验,并提交复验结果。When there is doubt about the quality of products, suppliers should carry out re-inspection, and submit the results of re-inspectionc. 绝热工程施工应在设备及管道的强度试验、气密试验合格后及防腐工程完工后进行。The insulation construction should be carried out after passing the gas-tight

11、and corrosion tests of the equipment and pipingd. 绝热施工前必须具备下列条件:The insulation must meet the following conditions before constructione设备管道的附属结构均安装完毕。Equipment and pipeline subsidiary structures are installedf电伴热或热介质伴热管安装就位,并通电或试压合格。Electric trace heating or hot medium with heat-pipe installed in pla

12、ce, and pass the power or pressure testg清除被绝热设备及管道表面的油污、铁锈。Remove of the oil, rust on the surface of equipment and pipe insulation h现场施工机具、水源、消防器具及保护用品都应准备完毕。The construction equipment, water, fire apparatus and Protective Devices should be ready On-sitei涂层若有脱漏或划伤应重新除锈和涂刷。If there is lacuna or scrat

13、ch on the coat, it should be re-rust and Brushing四、岩棉保温施工程序 Insulation of mineral wool construction procedure CSPC Debottlenecking Project CSPC-Foster Wheel PMTMS-8710-0023-6008 REV. 00 Page 4 / 16Method Statement For Insulation1、 施工工序:Construction procedure a 材料及机具准备 to prepare material and tools b

14、 确认设备具有保温条件后即可安装保温层 to install the insulation layer after check the condition of equipment insulationc 保护层预置及安装 to pre-fabrication and install the protection layerd 如有拆除部分也应按现场情况进行保温恢复 to replace the insulation layer if dismantle existing insulation layer e 外保护层缝隙进行防水处理,打密封胶 to do waterproof for pro

15、tection layer and to do seal gluef 清理现场。To do housekeeping. 2、施工工艺 construction techniquesa材料准备 prepare material 工程认定后按工程任务单准备材料 to prepare material follow the construction sheet 核对购买材料的品种、规格、数量、有效期、确认无误、分类存放,并做好防潮措施。To check the variety, standard, quantity, period of validity of the material. And confirm all are correct, then keep them and damp proof for them. b保温层安装。 Installation the insulation layer 保温层的安装要按照图纸要