1、 Shenzhen International Airport Terminal 3 Structural Narrative - Revision 5.1 Knippers Helbig Advanced Engineering Prof. Dr. Ing. Jan Knippers Dipl. Ing. Thorsten Helbig Tbinger Str. 12-16 D-70178 Stuttgart T +49 711 24839360 F +49 711 24839388 E infokhing.de Chapter F Analysis of Structure: Termin
2、al ? Approval Meeting, December 2nd, 2008 ?,? Shenzhen International Airport Terminal 3 Roof Structure Structural Narrative 02.12.2008 CHAPTER FCHAPTER FCHAPTER FCHAPTER F page 2 of 72 Knippers Helbig Advanced Engineering FAnalysis of the structure: Terminal ? F.1Main Roof Structure ? F.1.1Descripti
3、on of structural system ? F.1.1.1General ? Figure F-1 shows the location of the terminal roof. Its dimensions are approximately 640 m in width and 324 m in length, with a structural height varying between 3.0 m and 4.5 m. The shape of the roof is relatively flat with a slight curvature in the area a
4、round the middle axis (Figure F-2). ? F-1 ? 640 ? 324 ? 3 ? 4.5 ? ? F-2? Figure F-1: Overview ? F-1? For the structural analysis, the terminal is divided into three parts: Terminal Northeast, Terminal Center and Terminal Southwest (Figure F-2 to Figure F-4). The parts are separated from each other b
5、y movement joints. Movement joints also separate the terminal from the transition and the traffic center. TERMINAL ? Traffic Center ? MC 1 ? 1 MC 2 ? 2 MC 3 ? 3 Transition ? CC ? ? Northeast ? CC ? ? ? Southwest ? Terminal Northeast ? Terminal Southwest ? Terminal Center ? Shenzhen International Air
6、port Terminal 3 Roof Structure Structural Narrative 02.12.2008 CHAPTER FCHAPTER FCHAPTER FCHAPTER F page 3 of 72 Knippers Helbig Advanced Engineering ? 3 ?Figure F-2 ? Figure F-4? ? Figure F-2: Model of Terminal Center ? F-2 ? Figure F-3: Model of Terminal Northeast ? F-3 ? Shenzhen International Ai
7、rport Terminal 3 Roof Structure Structural Narrative 02.12.2008 CHAPTER FCHAPTER FCHAPTER FCHAPTER F page 4 of 72 Knippers Helbig Advanced Engineering Figure F-4: Model of Terminal Southwest ? F-4? The primary structure of the terminal consists of truss girders that span rectangular between the supp
8、orting columns (Figure F-5). In a regular field, the distance between two columns is 36 m. The truss girders are fixed to the columns and build a stiff frame, in order to brace the roof structure. ? Figure F-5? ? 36 ? ? Figure F-5: Primary Structure ? F-5? Shenzhen International Airport Terminal 3 R
9、oof Structure Structural Narrative 02.12.2008 CHAPTER FCHAPTER FCHAPTER FCHAPTER F page 5 of 72 Knippers Helbig Advanced Engineering The secondary structure spans between the trusses of the primary structure and follows the rhombic shape of the faade, supporting the faade panels. ? The secondary str
10、ucture itself is divided into primary and secondary elements, where the primary elements form a spatial framework (Figure F-6). ?Figure F-6? Figure F-6: Primary Members of Secondary Roof Structure ? F-6? The secondary elements in between the rhombi consist of purlin crosses (Figure F-7), which are p
11、inned to the primary elements. In a purlin cross, two of the four purlin connections have axial hinges as well, so that the purlin crosses will transfer loads mainly by bending and tension. ?Figure F-7? ? 36 m 36 m 9 m 6 m Shenzhen International Airport Terminal 3 Roof Structure Structural Narrative
12、 02.12.2008 CHAPTER FCHAPTER FCHAPTER FCHAPTER F page 6 of 72 Knippers Helbig Advanced Engineering Figure F-7: Purlins ? F-7 ? In the areas around the columns, the structure is reinforced (Figure F-8). ?Figure F-8? Figure F-8: Reinforced Structure around Column Area ? F-8 ? Shenzhen International Ai
13、rport Terminal 3 Roof Structure Structural Narrative 02.12.2008 CHAPTER FCHAPTER FCHAPTER FCHAPTER F page 7 of 72 Knippers Helbig Advanced Engineering F.1.1.2Bracing and Movement Joints ? A movement joint in axis 14 separates the terminal roof from the transition. Movement joints in axis EF and WF f
14、urther divide the roof into three parts. The structure ends on axis G4. ? 14? EF ? WF ? ? G4? In order to brace the structure horizontally, four cores are connected to the roof: Two in the Center Part and one each in the Northeast and the Southwest Part (Figure F-9). ? ?Figure F-9? Figure F-9: Bracing of terminal roof ? F-9 ? Furthermore, the roof structure is fixed to the columns, which also transfer part of the horizontal loads into the ground. ?