gs020汽车发动机底盖冲压模具的设计与制造

上传人:xins****2008 文档编号:101286728 上传时间:2019-09-27 格式:DOC 页数:123 大小:2.33MB
返回 下载 相关 举报
gs020汽车发动机底盖冲压模具的设计与制造_第1页
第1页 / 共123页
gs020汽车发动机底盖冲压模具的设计与制造_第2页
第2页 / 共123页
gs020汽车发动机底盖冲压模具的设计与制造_第3页
第3页 / 共123页
gs020汽车发动机底盖冲压模具的设计与制造_第4页
第4页 / 共123页
gs020汽车发动机底盖冲压模具的设计与制造_第5页
第5页 / 共123页
点击查看更多>>
资源描述

《gs020汽车发动机底盖冲压模具的设计与制造》由会员分享,可在线阅读,更多相关《gs020汽车发动机底盖冲压模具的设计与制造(123页珍藏版)》请在金锄头文库上搜索。

1、Gay is now a provincial key construction project of aluminum Ltd-province with an annual output of 50,000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager. In this technological transformation projects, he has overall respons

2、ibility for the day-to-day affairs of the project. In order to ensure that southern companys control the scale of investment, strengthen field management, pay special attention to project progress, and ensure a successful operation, the overall goal. He and Engineering Department under the leadershi

3、p of all the staff in the companys technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding achievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. Technical

4、 innovation project of the year, started and completed a series of bids and completed to date, from production engineering to put into production after nearly a year, has achieved very significant results. A project first 56 slots from dismantling the old slot just 168 days, civil engineering, insta

5、llation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industrys fastest speeds. II 32 large prebaked electrolytic cell on November 7 has been installed, marks has an annual production capacity o

6、f 50,000 tons of electrolytic aluminum production capacity of aluminum. Entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that year, created favorable conditions for aluminum through South. Second, effectively control the investment. Project

7、 is subject to a scientific approach to bidding, bidding to make savings of 20 million Yuan, in the implementation process of the project, every domestic prices of steel, cement and other building materials, the old buildings on the base encountered great difficulties in dealing with significant inc

8、rease in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million Yuan. Third, environmental energy-saving effect of the project. Project investment of nearly 30 million Yuan, using large prebake technology and aluminum oxide d

9、ense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification efficiency of up to 98%. Compared with Soderberg cell before the modification, power consumption can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy

10、saving effect is obvious. Four are in a relatively short period of time to the normal production. After four months of efforts, a project has put into operation all the 54 240KA large cell into regular production, stable current channel conditions and all the economic indicators are good, current ef

11、ficiency in October had reached 93%, is close to and reach the domestic advanced level. In the case of production half of the cell, this effect can be achieved and better level in the industry. 50,000 tons of electrolytic modification process, from preliminary study to equipment selection, cost cont

12、rol, project progress, quality control and coordination among the various sub-projects and various professional, technical command under the correct leadership, both from an overall perspective, emphasis on integrity, and earnestly implement the relevant laws and regulations, strictly act according

13、to the contract. He tried to learn relevant knowledge, good style of business, operational and organizational coordination ability, project efficiency, quality and safety assurance system in place, with all units involved with the coordination and good .江西理工大学应用科学学院毕业设计GS020 汽车发动机底盖冲压模具的设计与制造摘要本论文对冲

14、压模具的设计与制造和研究进行了在国内外发展现状以及在国内外模具的发展趋势进行了详细的分析,也了解到了模具在工业中的具有的重要性,在工业领域中占着不可取代的重要性,就 GS020 汽车发动机底盖冲压模具的设计与制造为研究对象,选汽车模具为讨论课题进行研究分析及实践。通过模具产品料条分析及成型性分析,计算模具冲压力及凸凹模尺寸计算,从而得到整套模具的框架。理论离不开实践,当模具结构确定之后,对模具的每一块钢块进行材质分析和选择,对加工模具钢块进行工艺分析,对模具的组立进行分析,对模具的调试进行检讨和分析。最终完成了模具的组立和调试,达到了客户的要求,也满足了市场的需求,研究结果告诉我们,工业的发展

15、离不开模具的生产和制造,模具可以大批量生产且能精确的完成复杂的工业产品,且寿命较长,不宜损坏,易维修。关键词:大批量;精确;长寿命;复杂Four outstanding works. They are derived from their own inner feelings. I also sent a student to attend the class Department speech contest, failed to get a good result, but also actively cooperate with the Department and class acti

16、vities! in order to create a demonstration dorm room, our weekly class to every bedroom check, where proposed is insufficient. In order to clean up the bedroom, we use the brush brushes a bedroom again. For the class out of a force. In the event we, many projects did not get the desired results. But we understand that we tried, and in the struggle. Also has made good progress in many of the! in my

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 大杂烩/其它

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号