【2017年整理】德国ELMENTAR公司liquiTOC II说明书:Chap-4_安装和初始化

上传人:豆浆 文档编号:1004725 上传时间:2017-05-25 格式:DOC 页数:17 大小:2.13MB
返回 下载 相关 举报
【2017年整理】德国ELMENTAR公司liquiTOC II说明书:Chap-4_安装和初始化_第1页
第1页 / 共17页
【2017年整理】德国ELMENTAR公司liquiTOC II说明书:Chap-4_安装和初始化_第2页
第2页 / 共17页
【2017年整理】德国ELMENTAR公司liquiTOC II说明书:Chap-4_安装和初始化_第3页
第3页 / 共17页
【2017年整理】德国ELMENTAR公司liquiTOC II说明书:Chap-4_安装和初始化_第4页
第4页 / 共17页
【2017年整理】德国ELMENTAR公司liquiTOC II说明书:Chap-4_安装和初始化_第5页
第5页 / 共17页
点击查看更多>>
资源描述

《【2017年整理】德国ELMENTAR公司liquiTOC II说明书:Chap-4_安装和初始化》由会员分享,可在线阅读,更多相关《【2017年整理】德国ELMENTAR公司liquiTOC II说明书:Chap-4_安装和初始化(17页珍藏版)》请在金锄头文库上搜索。

1、4. Installation and start-up 安装和初始化Installation and operation of the liquiTOC and peripheral equipment should only be carried out by persons who have been authorized by Elementar Analysensysteme GmbH. Opening the transport packing by unauthorized personnel can lead to loss of warranty rights! If the

2、 supplied instruments show damages, please contact the freight forwarder and the manufacturer immediately.LiquiTOC 和次要设备的安装和操作必须由经德国元素分析系统公司授权的人来执行。未经授权的人员打开运输包装会失去保单权。4.1 Preparations for operation 操作的准备These prerequisites are absolutely adhered to for a smooth operation of the liquiTOC.对于 liquiTOC

3、 的顺利操作必须遵照这些先决条件。4.1.1 Working environment 工作环境The installation site for the liquiTOC and the respective peripheral equipment as autosampler and PC should be protected from draught and direct sources of heat. An air conditioned room is recommended as some parts of the analyzer give off heat.In addit

4、ion, appropriate steps are to be taken to avoid electrostatic charges. Electrical discharges on the unit can lead to malfunctions.At the installation site the surrounding CO2 concentration should be stable and low ( 800 ppm CO2).LiquiTOC 安装地点和相应的周围设备如自动进样器和 PC 应通风和直接热源的排放。我们推荐有空调的房间因为一些分析配件散发热量。另外,要

5、采取适合的方法避免静电。仪器上的电子排放会引发生故障。在安装地点周围 CO2 浓度应保持稳定和低于 800ppm。placement area 更换区域type of protection: IP 20only in dry, well ventilated rooms; installation of the liquiTOC only on an acid and heat resistant surface 保护类型:IP 20 只在干燥,通风好的房间;liquiTOC 安装只在酸和耐热表面上space requirement(incl. PC, autosampler and reag

6、ent vessels)空间要求(包括自动进样器和试剂容器)entire surface areaapprox. 120 x 55 x 35 cmdistance from the walls at least 20 cm at all sides, otherwise the fans of the unit will not function properly. Optional modules require additional space.整个界面区域约 120*55*35cm四周距离墙至少 20cm,否则仪器的风扇就不能正常工作。可选模式需要增加空间。Ambient tempera

7、ture 周围温度constant temperature 不间断温度permissible min.: + 15Cmax.:+ 30C Power supply 电源供应230 Volt AC 10 %, 50/60 Hzconnected load: 1.9 kVApower supply and frequency must match the information on the legend plate of the instrument 电源供应和频率必须满足仪器铭牌上的信息Connections 连接 6 sockets 6 个插座protection class I, conn

8、ection for grounded conductor wire 保护级 I,连接接地器required fuse protection: 16 A/delay-action fuse 要求保险丝保护:16A/延迟熔丝反应gas connections 气体连接gas connections must be available in the immediate vicinity of the instrument. Pressure reducing valves are required for connection. Pressure reducing valves O2 for sy

9、nthetic air with two steps (2nd step 0-3 bar) with shut-off valve (for order instructions see chapter 1).气体连接必须在仪器附近。需要钢瓶气体减压阀。O2 的减压阀可用于合成空气.(见第一章的订购指南)Exhaust pipe 排气管 atmospheric into the open air or a fume hood because of toxic gases (see safety instructions).将有毒气体排放到室外大气或通风装置中(见安全指南)Waste pipe

10、废气管 atmospheric; a totally undisturbed discharge into a non metallic outlet must be guaranteed (see safety instructions).大气;保证不干扰的排放到非金属出口(见安全指南)The installation room must be well ventilated! The exhaust gas pipe (connection IR and maybe CLD) must lead into the open air or into a fume hood because d

11、uring operation some sample components may release toxic gases (e.g. SO2 , NO, NO2, Cl2 etc.) with the carrier gas. It is possible that during constant operation the gas content of the air exceeds the permissible maximum workplace concentration .The end of the gas pipes must lead to a sheltered (win

12、d-free) place in the open air since pressure fluctuations, for instance through wind, lead to detector instabilities.安装房间必须很好地通风。排气管(IR 连接和 CLD)必须导入室外的大气或通风装置中,因为在操作期间一些样品部分会释放有毒气体并由载气排出(如:SO2,NO,NO2,Cl2 等)。在不断操作期间可能空气的气体含量会超过允许最大工作地的浓度。由于压力的波动,排气管地未端必须导入室外的大气空气并有遮蔽的地方(无风),风会引起检测仪的不稳定。4.1.2 Necessar

13、y gases and chemicals 必要的气体和化学品When handling chemicals observe the safety instructions of the chemical manufacturer (see labels on bottles and safety data sheets)!When handling hydrochloric acid, it is necessary to wear safety goggles and suitable protective clothing!Danger of caustic burns!处理化学品时参看

14、化学品制造商的安全指南(见瓶上的标签和安全数据页)!处理盐酸时,有必要带上安全镜和适合的保护衣。carrier gas 载气 synthetic air (carbon hydrogen 0.1 ppm, CO2 1 ppm) prepressure 1.0 bar use: approx. 500 ml/min合成空气(碳氢0.1ppm,CO2 1ppm)气体压力: 1.0 bar使用:约 500ml/分钟Reagents 试剂 deionized water (C-content 1 mg/l)去离子水(C-content 1 mg/l)(see chapter 4.3.5) 0.8 %

15、hydrochloric acid p.a. (see chapter 4.3.4)chemicals for filling the reactor or absorption tubes are included in the basic set of consumables.0.8%盐酸,纯度 p.a.(见 4.3.4)填入反应器/或吸收管的化学品包括在基本消耗品calibration standards 校正标样 potassium hydrogen phtalate (KHP) sodium carbonate Na2CO3 ammonium sulfate (NH4)2 SO4 p

16、otassium nitrate (KNO3 )These substances must have at least p.a. quality (see chapter 8).这些物质必须至少有 p.a.纯度(见第 8 章)4.2 Instrument installation 仪器安装The walls of the liquiTOC should only be opened by authorized personnel for maintenance and servicing purposes.由于维护和服务得目的,LiquiTOC 盖子只能由授权得人员打开。The design of the basic unit of the liquiTOC is as follows: 以下是 liquiTOC 基本单元的设计:4.2.1 Front of the unit 仪器的前部Behind the front door there is the fur

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 行业资料 > 其它行业文档

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号